Cubis stakkabox Скачать руководство пользователя страница 9

9

TABLE 1

Product

EN 124

 

Group

Recommended  minimum Cover 

Class

*

Maximum  Chamber 

Depth  (mm)

Exca

va

tion Footprint

Base Material

Bracing

Backfill

Additional Information.

1A

15

120

01

00

mm

 or width of com

pacting equipm

en

t5

0m

of com

pacted stone (MOT

1)

Co

mp

acted MO

T1

 stone, or as dug 

ma

terial if of a g

ranular t

yp

e.

2B

12

5

120

01

00

mm

 or width of com

pacting equipm

en

t1

00

mm

 of co

mp

acted stone (MOT

1)

Co

mp

acted MO

T1

 stone or lean 

mi

x concrete

.

3

C250

120

01

50

mm

 or width of com

pacting equipm

en

t1

50

mm

 of lean 

mi

x concrete (C40)

Mini

mu

150m

C40 concrete

4

D400

200

02

00

mm

 or width of com

pacting equipm

en

t

150m

of lean 

mi

x concrete (C40), 

reinforced w

ith 

A393 

me

sh

.

Mini

mu

200m

C40 concrete

1A

15

120

01

00

mm

 or width of com

pacting equipm

en

t5

0m

of com

pacted stone (MOT

1)

2B

125

120

01

00

mm

 or width of com

pacting equipm

en

t1

00

mm

 of co

mp

acted stone (MOT

1)

3

C250

120

01

50

mm

 or width of com

pacting equipm

en

t1

50

mm

 of lean 

mi

x concrete (C40)

Mini

mu

150m

C40 concrete

4

D400

200

02

00

mm

 or width of com

pacting equipm

en

t

150m

of lean 

mi

x concrete (C40), 

reinforced w

ith 

A393 

me

sh

.

Mini

mu

200m

C40 concrete

1A

15

240

01

50

mm

 or width of com

pacting equipm

en

t5

0m

of com

pacted stone (MOT

1)

Sidewall length < 1500m

As dug i

f gran

ular is ok

, otherw

ise co

mp

acted MO

T1

 stone. 

Sidewall length between 1500 and 2500

mm

 com

pacted MOT

1 stone.

 

Sidewall length > 2500m

mi

ni

mu

150m

C40 Concrete

2B

125

240

01

50

mm

 or width of com

pacting equipm

en

t1

00

mm

 of co

mp

acted stone (MOT

1)

Sidewall length < 2500m

co

mp

acted MO

T1

 stone

Sidewall length > 2500m

mi

ni

mu

150m

C40 concrete

3

C250

240

01

50

mm

 or width of com

pacting equipm

en

t1

50

mm

 of lean 

mi

x concrete (C40)

Sidewall length < 2500m

co

mp

acted MO

T1

 stone

Sidewall length > 2500

mm

 m

inim

um

 150

mm 

C40 concret

e

4

D400

2400

200m

or width of co

mp

acting equip

me

nt

150m

of lean m

ix concrete (C40), 

reinforced w

ith A393 m

esh.

Mini

mu

200m

C40 concrete

5E

600

240

02

00

mm

 or 

width o

f co

mp

acting equip

me

nt

250m

of lean 

mi

x concrete (C40), 

reinforced w

ith 2 lay

ers A393 

me

sh

 

equall

spaced

.

Mini

mu

250m

C40 concrete

1A

15

120

01

00

mm

 or width of com

pacting equipm

en

t5

0m

m

 of co

mp

acted stone (MOT

1)

Bracing required on 

cham

bers w

ith side wall

 

Co

mp

acted MO

T1

 stone, or as dug 

ma

terial if of a granular t

yp

e.

2B

12

5

120

01

00

mm

 or width of com

pacting equipm

en

t1

00

mm

 of co

mp

acted stone (MO

T1

)

Bracing required on 

cham

bers w

ith side wall

 

lengths greater than 

600m

m.

 

Co

mp

acted MO

T1

 stone or lean 

mi

x concrete.

3

C250

120

01

50

mm

 or width of com

pacting equipm

en

t1

50

mm

 of lean 

mi

x concrete (C40)

Bracing required on 

cham

bers w

ith side wall

 

lengths greater than 

600m

m.

 

Mini

mu

150m

C40 concrete

4

D400

200

02

00

mm

 or width of com

pacting equipm

en

t

150m

of lean 

mi

x concrete (C40), 

reinforced w

ith A393 m

esh.

Bracing required on 

cham

bers w

ith side wall

 

lengths greater than 

600m

m.

 

Mini

mu

200m

C40 concrete

1A

15

200

01

00

mm

 or width of com

pacting equipm

en

t5

0m

of com

pacted stone (MOT

1)

No requirem

ent for 

bracing.

Co

mp

acted MO

T1

 stone

2B

125

200

01

00

mm

 or width of com

pacting equipm

en

t1

00

mm

 of co

mp

acted stone (MOT

1)

No requirem

ent for 

bracing.

Co

mp

acted MO

T1

 stone or in areas w

here additional stabilit

is required lean m

ix

 

concrete can be used.

3

C250

200

01

50

mm

 or width of com

pacting equipm

en

t1

50

mm

 of lean 

mi

x concrete (C40)

No requirem

ent for 

bracing.

Mini

mu

150m

C40 concrete

4

D400

200

02

00

mm

 or width of com

pacting equipm

en

t

150m

of lean 

mi

x concrete (C40), 

reinforced w

ith 

A393 

me

sh

.

No requirem

ent for 

bracing.

Mini

mu

200m

C40 concrete

Double bracing, equall

spaced

mm 

single central 

bracing, required in both 

directions

.

mm 

double

 

bracing at equal

 

spacing.

mm 

bracing at

 

600m

spacing using 

acro

props, both 

hori

zo

ntall

and vertical

ly

.

Mini

mu

100m

C40 concrete

*Cover Class, 

refers to recommended mini

mum frame & cover for EN124 Group, backfill r

equirements are as per EN124 Group, see diagram xxx for referenc

e

Footw

ay

 Fortress

Carriagew

ay

 

Fortres

s

M

odula (Sidew

all 

upto 1200mm)

Modula (Sidew

all 

grea

ter 1200mm)

Ultima

Hy

drant Sections

 require onl

granular bac

kf

ill. Final adjustm

ent is

 

not necessar

y,

 25m

sections

 

available. Split base/dog 

ke

nnel

 

arrangm

ent around infrastructure.

 

TS

SL

 

base section do not require to

 

be concreted, 

mi

ni

mu

depth of

 

450m

upto 900

mm

French 

Te

lecom       

SN

C

F       

Mo

to

rw

ay

 Communications 

approved, total s

ys

te

available fro

su

mp

 base, brack

etry

 and cover.

Bracing required on 

cham

bers w

ith side wal

lengths greater than 

600m

m.

 

It is key to note that the chamber backfill conditions relate to where the chamber is installed (EN124 Group). 

Example

 - If an UL

TIMA 

Chamber 1310 x 850 x 1050 deep is to be installed in the footpath (Group 2) but 

with a D400 Ductile iron frame and cover. 

This should be installed as a group 2 Chamber i.e. base - 100mm

 

compacted MOT 

TYPE 1, backfill - 150mm compacted MOT

 T

ype1. 

Содержание stakkabox

Страница 1: ...INSTALLATION GUIDE STAKKAbox Range General guide www cubis systems com 44 0 28 38 313 100 techsupport cubisindustries com ...

Страница 2: ...h laws regulations codes or orders of such authorities the customer shall be responsible for the violations thereof and shall bear the costs expense and damages attributable to its failure to comply with the provisions of such laws ordinances rules regulations codes or orders Reproduction of the material herein is not permitted without the written consent of CUBIS Industries NOTES ON APPLICATION T...

Страница 3: ... the correct loading as dictated by European standards or any other relevant authority CUBIS Industries manufacture a range of covers and frames engineered to work in conjunction with its chambers Covers and frames that are not supplied by CUBIS should be agreed to be fit for purpose prior to installation as this might adversely affect the quality of the installation HEALTH AND SAFETY In areas whe...

Страница 4: ...m ring section is now carefully positioned on the base If the chamber system does not have a preformed base then the ring should be gently tapped so that it beds down into the base by approximately 10mm The correct orientation of the chamber ring is with the horizontal lip to the bottom Check that the ring is level and at the correct depth If a concrete base is being used the concrete can be float...

Страница 5: ...xisting duct 8 3 In both cases it is important that a complete ring is installed either side of the cut ring section Wall Furniture Security Systems 9 Wall furniture can be installed at this stage if not already factory fitted 9 1 Mark the position of the furniture as required by the clients specification on the chamber walls drill 11mm holes and fix the furniture with the bolts supplied 9 2 If us...

Страница 6: ...ound of the chamber can now take place Backfilling is formed in layers and should be completed to the top of the chamber or in the case of a roadway construction to the underside of the blacktop construction Refer to Table 1 for the recommended backfill material and required width of material Refer to Specification for the Reinstatement of Openings in Highways Appendix A8 for the depth of layers a...

Страница 7: ...ate 13 2 Remove the frame and apply the mortar bed This should be approximately 10mm higher than required and 25mm greater than the spread of the underside of the frame 13 3 Carefully position the frame on to the mortar bed taking care that the inside faces of the frame line up with the edges of the chamber If using a rising frame this should happen automatically 13 4 Gently tap the frame into the...

Страница 8: ...compacted thickness up to for compacted thickness up to 100mm1 50mm 200mm1 00mm1 50mm 200mm Vibrotamper 50 kg minimum 48 N P4 8N P Single Drum 1000 2000 kg m 8 NP NP 6N PN P 2000 3500 kg m 36N P3 57 Over 3500 kg m 346 346 Twin Drum 600 1000 kg m NP NP NP 6N PN P 1000 2000 kg m 48N P 36N P Over 2000 kg m 235 234 1400 1800 kg m2 N PN PN P5 NP NP Over 1800 kg m2 36N P3 57 Notes 1 2 3 4 Vibrotamper 25...

Страница 9: ...0mm of compacted stone MOT1 Bracing required on chambers with side wall lengths greater than 600mm Compacted MOT1 stone or lean mix concrete 3 C250 1200 150mm or width of compacting equipment 150mm of lean mix concrete C40 Bracing required on chambers with side wall lengths greater than 600mm Minimum 150mm C40 concrete 4 D400 2000 200mm or width of compacting equipment 150mm of lean mix concrete C...

Страница 10: ...10 DIAGRAM 1 ...

Страница 11: ...11 DIAGRAM 2 Typical detail of a hard shoulder showing the location of some installation groups ...

Страница 12: ...ntact us Head Office 4 Silverwood Industrial Estate Lurgan Co Armagh BT66 6LN Northern Ireland Telephone 44 0 28 38 313 100 Email techsupport cubisindustries com Web www cubis systems com v 1 3 01 02 2016 ...