![Cubis stakkabox Скачать руководство пользователя страница 5](http://html.mh-extra.com/html/cubis/stakkabox/stakkabox_installation-manual_2695453005.webp)
5
Overbuilding Existing Services
8
. Where chambers are required to be built over existing services, STAKKAbox can easily accommodate this by either:
8.1
. Cutting a duct entry in the appropriate ring section as previously described and then with a hand saw cutting from the bottom of
the ring to make an open ended arch.
8.2
. Alternatively, after the duct entry has been formed, the ring can be cut longitudinally and reassembled around the existing
duct.
8.3
. In both cases it is important that a complete ring is installed either side of the cut ring section.
Wall Furniture & Security Systems
9
. Wall furniture can be installed at this stage if not already factory fitted.
9.1
. Mark the position of the furniture as required by the clients’ specification on the chamber walls, drill 11mm holes and fix the furniture with
the bolts supplied.
9.2
. If using Footway Fortress, the wall bears simple hang in the preformed slots.
9.3
. Wall furniture and security systems can be retrofitted at a later date on most chambers. For specific details please contact
CUBIS directly.
www.
cubis-systems
.com