Air Supply:

The air supply must be turned off and all electrics disconnected before making adjustments on the power feed.
A working pressure of 75 PSI (pounds per square inch at 5.4 kg/cm

2

) is required.  An industrial-type compressor

of at least 3 CFM (cubic feet per minute) is recommended.  An additional 3 CFM is required for Spray Mists.
A conveniently located valve should be supplied by the user to shut off the air line.  

Arms should be raised or

lowered 

by hand 

 when setting up machine.

  The machine must use clean, filtered air. The speed of descent of

the saw head will vary if the air pressure varies.  An Air Filter/Regulator/Lubricator is essential.

Air Cushion Bearing System:

The machine you have purchased comes with a built-in air cushion bearing system that works off your air supply.  If you
have purchased an air/pneumatic system, then the air bearing will be charged when you add air to the machine.
If the machine you purchased is a manual machine, then the 1/4” blue air line at the back base of the machine must be
connected to at least 75lb PSI of air pressure for the bearings to work properly.
The operator should have the air switch in the “off” position when not changing the mitering angles.  The air bearing is self
cleaning and self lubricating when used with the CTD air filter/regulator/lubricator.  If the machine was bought without the
FRL, then every 2  months, 3 drops of light machine oil should be placed into the blue 1/4” inlet air line at the back of the
machine.

FR:

An Air Filter/Regulator is installed ahead of the air inlet to the machine.  This system helps prevent foreign material from
entering the system.  It also provides lubrication in the air supply which helps prevent valves and cylinders from sticking.
The FR is comprised of two different components.
1.   The Air Filter Bowl is located on the left side and is provided with an automatic drain.  This collects and
      then releases foreign matter and condensation collected by the air filter.
2.   The Pressure Regulator, which is located on top of the air filter, controls the amount of air pressure  allowed
      into the system.  An operating pressure of 75 PSI @ 5.4 kg/cm

2

 is required.  (This is set at the factory.)

-14-

Trouble Shooting the Pneumatic System for Downfeed of Saw Head:

If the Air Feed no longer has smooth action, check the Downstroke Control Valve, P/N 2B3P61.  If there is no
Speed Control, replace with Part No. 2B3P61.  If air is leaking from the bottom of the cylinder, replace Cylinder
with Part No. 2B3P05 (for 200R and CM325R).

4-Way Valve:

The 4-Way Valve is the main control, five port valve located on the Air Feed Unit.  If the saw is sticking in the
up or down position, the spool located in the valve probably is not shifting from side to side as necessary. This
condition is caused by unclean air passing through the system.  The internal parts become gummed up, and the
air pressure can no longer shift the spool.  A broken spring in the valve is another common cause. A 4-Way Valve
Repair Kit, P/N B3P76, is available for the valve.

Air Filter/Regulator

Содержание CM325R

Страница 1: ...S M25R F255R F255RHC M25RHC CM325R 05 2016 CTD MACHINES 2382 E 48th Street Vernon CA 90058 Tel 213 689 4455 FAX 213 689 1255 World Wide Web http www ctdsaw com e mail ctdsaw ctdsaw com CTD MODEL NO CT...

Страница 2: ...h x 4 101mm Wide 3 1 2 89mm High x 4 101mm Wide 45 Mitre 3 1 4 82mm High x 5 127mm Wide Cutting Capacity with fences set at centerline 3 1 2 89mm High x 3 1 2 89mm Wide 45 Mitre 2 1 2 64mm High x 3 1...

Страница 3: ...Support Tables and Measuring Gages Standard Machine The standard model has been completely assembled Fences are set at the centerline of the blade see Diagram D on Page No 5 Adjust fences forward if...

Страница 4: ...puller p n 200M320 off puller screw and bushing through large hole on slot Remove four machine nuts on Blade Guard Cover 200F250L or R The entire Lower Blade Guard Cover Assembly p n 200E250L or R com...

Страница 5: ...attach any additional guarding to the blade guard or table base if the cutting application causes unsafe blade exposure This label is attached to the blade guard Never put hand or fingers near or unde...

Страница 6: ...HIS MAY CAUSE SEVERE DAMAGE AND DANGER Consult the factory if any changes are needed Bring power lines to the top of the Manual Overload Starter or Magnetic Starter Use dust proof connectors if availa...

Страница 7: ...machine weekly for proper maintenance 11 Keep work area clean Cluttered areas benches and slippery floors invite accidents 12 Avoid dangerous environments Keep work area well illuminated 13 Wear ear p...

Страница 8: ...WiringDiagrams...

Страница 9: ......

Страница 10: ...sure mitre lock down bolt located in the center of the pivot bracket see Diagram D E is loosened 3 To lock in at preset angles rotate sawhead and disc near the desired angle aligning with zero mark on...

Страница 11: ...sandarehighlyrecommended If you purchased your machine with anAir Downfeed of the saw the clamps are actuated prior to activating saw head by depressingtheFootValve AnAnti TieDown TwoHandControldrives...

Страница 12: ...modifiedblade for best results Consult factory Never use a wood blade to cut aluminum as it will chip and fracture the carbide tips of the blade CuttingAluminum Aswithcuttinganymaterial itisimportantt...

Страница 13: ...ured increments The majority of the lubricant then dissipates with the heat of the cutting action Chips coming off the blade are hot and dry and are more easily collected See specific instructions inc...

Страница 14: ...tilTwo Hand activation The system will not allow unclamped material to be cut The two hand buttons must be depressed at the same time for the saw head to travel downwards The system operates first by...

Страница 15: ...ir Feed 1 200M82 Cylinder Clevis 1 200M84 3Way Valve Bracket 1 200M87 Power Feed Cylinder Support Bar 1 200M86A Rotating Cross Bar for Cylinder 1 B3P86 S1 Shuttle Valve 1 B3P51 FV 3 Way Normally Close...

Страница 16: ...d into the blue 1 4 inlet air line at the back of the machine FR AnAirFilter Regulatorisinstalledaheadoftheairinlettothemachine Thissystemhelpspreventforeignmaterialfrom enteringthesystem Italsoprovid...

Страница 17: ...bly are constructed using preloaded belleville springs These springs eliminate the need for adjustments of bearings and also greatly increase the life of thebearings Allaircylindersare lubeforlife Gen...

Страница 18: ...anually rotate top base to desired degree setting aligning angle mark with zero block 45 and 90 stops are provided 3 Tighten lock down bolt If you desire to mitre beyond 45 to the right then 45 stop m...

Страница 19: ...press or pulley puller H Press off slinger and bearing from spindle I Press new bearing on to spindle making sure spindle is square to the bore J Replace slinger as above making sure scored lines mat...

Страница 20: ...front Belt guard is on right side blade guard is on left side No Description Part No CM325R SPINDLE ASSEMBLY 1 Spindle Right Hand 30BM02R Spindle Left Hand 30BM02L 2 Flange 30BM03 3 Slinger 30BM04 4...

Страница 21: ...19 LEFT OPPOSITE 200 SERIES RIGHT SAW ASSEMBLY...

Страница 22: ...L 12 Blade Guard Cover Left 200F250R 12 Blade Guard Cover Right 200A26L 12 Main Blade Guard Left 200A26R 12 Main Blade Guard Right 200E250L R Cover Lower Blade Guard Assy with Link Puller L R 200A270L...

Страница 23: ...21 200 Series Right Blade Guard Assy Left Opposite REAR VIEW...

Страница 24: ...22 M25R Base Assembly Exploded View Top View Additional Parts 250E01 M25R Base Disc Assy 200E07 Fence and Bracket with fasteners...

Страница 25: ...23 F255R Base and Floor Stand Exploded View Additional Parts 25E01 F255 Base Assy 200E07 Fence and Bracket with fasteners...

Страница 26: ...24 Air Feed System Exploded View...

Страница 27: ...25 CM325R Left Saw Assembly Right Opposite...

Страница 28: ...iew Additional Parts 300E260L R Blade Guard Assy Complete Lt or Rt 300A26 L R Main Blade Guard Casting Lt or Rt 300F250L R Cover Main Blade Guard Left or Right 200A270L R Lower Blade Guard Assy w pin...

Страница 29: ...27 CM325R Left Base Assy Right Opposite...

Страница 30: ...M25HC Base Assembly Exploded View 28...

Страница 31: ...200HC Series Blade Guard Assembly 29...

Страница 32: ...cellaneous Parts 2D7SR Right to Left Measuring Tape 2D7SL Left to Right Measuring Tape 10P01 Soluble Oil one gallon can B5P01 Single Phase Toggle Switch B5P02 Three Phase Toggle Switch 200BE38 Stop As...

Страница 33: ...Notes...

Страница 34: ...ise shallnotinanyway include consequential damages or costs of removing or re installingtheproducts All parts and machines are shipped F O B CTD LosAngeles CAPlant CTD MACHINES 2382 E 48th Street Vern...

Отзывы: