![CTC Union EcoPart 425-435 Скачать руководство пользователя страница 42](http://html1.mh-extra.com/html/ctc-union/ecopart-425-435/ecopart-425-435_installation-and-maintenance-manual_2693353042.webp)
42
CTC EcoPart i425-i435 Pro
General Information
7. Operation and
Maintenance
When the installer has installed your new heat pump, you should check
together that the system is in perfect operating condition. Let the installer
show you where the power switches, controls and fuses are so that you
know how the system works and how it should be maintained. Bleed the
radiators (depending on type of system) after around three days of operation
and top up with water if required.
7.1 Periodic maintenance
After three weeks’ operation and then every three months during the first
year. Then once a year:
• Check that the installation is free of leaks.
• Check that the product and system are free of air; bleed if needed –
see the section Connecting the brine system.
• Check that the brine system is still pressurised and that the fluid level in
the brine vessel is adequate/correct.
• No annual leakage control of the refrigerant is required.
7.2 Shut-down
The heat pump is shut down using the operating switch. If there is a risk of
the water freezing, drain out all the water.
7.3 Service position
Содержание EcoPart 425-435
Страница 31: ...31 CTC EcoPart i425 i435 Pro General Information ...
Страница 34: ...34 CTC EcoPart i425 i435 Pro General Information 5 6 Wiring diagram CTC i425 i435 Pro 400 V 3N ...
Страница 36: ...36 CTC EcoPart i425 i435 Pro General Information 5 7 Cooling module 400V 3N CTC EcoPart 406 417 ...
Страница 38: ...38 CTC EcoPart i425 i435 Pro General Information 5 8 Wiring diagram CTC i425 i430 Pro 230 V 1N ...
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ...Enertech AB P O Box 309 SE 341 26 Ljungby Sweden www ctc se www ctc heating com ...