![CTC Union EcoPart 425-435 Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/ctc-union/ecopart-425-435/ecopart-425-435_installation-and-maintenance-manual_2693353017.webp)
17
CTC EcoPart i425-i435 Pro
General Information
!
If a cooling module is connected on the side, the
opening must be lined with the edge moulding
provided to prevent abrasion against the hose.
3.2 Connection
Connection can be made to the right, left or top or rear of the heat pump.
Cut away the cover plate on the side where the hoses are to be connected.
When the opening has been made through the cover plate, carry out the
installation as follows:
1. In order to protect the hoses, fasten the protective edging provided
around the edge of the opening in the insulation plate. Adjust the length
of the protective edging to suit the opening as required.
2. Pass the hoses through the opening in the side cover plates and
connect them. Ensure that the insulation covers all parts of the brine
connection to prevent ice and condensation forming.
3. Then install the collector system.
You can also connect the primary flow on one side and the return on the
other. See the chapter on Measurement details for measurements and
dimensions. The pipe between the heat pump and brine loop should not be
less than Ø35 mm in dimension.
Содержание EcoPart 425-435
Страница 31: ...31 CTC EcoPart i425 i435 Pro General Information ...
Страница 34: ...34 CTC EcoPart i425 i435 Pro General Information 5 6 Wiring diagram CTC i425 i435 Pro 400 V 3N ...
Страница 36: ...36 CTC EcoPart i425 i435 Pro General Information 5 7 Cooling module 400V 3N CTC EcoPart 406 417 ...
Страница 38: ...38 CTC EcoPart i425 i435 Pro General Information 5 8 Wiring diagram CTC i425 i430 Pro 230 V 1N ...
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ...Enertech AB P O Box 309 SE 341 26 Ljungby Sweden www ctc se www ctc heating com ...