6
CTC EcoFlex
General Information
The way CTC EcoFlex is designed makes it very simple to install. The small
dimensions mean that it can be installed in boiler rooms, which are often
very small. Most pipe fittings are on the top of the boiler. Electrical installation
is to a terminal block behind the control panel. Boiler service is simplified
by all connections and components being easily accessible from the front.
The boiler is swept through the combustion chamber hatch and through the
cleaning door on the top.
Ashes are emptied from the large ash bin attached to the ash door. The ash
bin holds around 45 litres of ash and is emptied as required. The carefully
developed design and the good fault tracing functions in the control system
makes the CTC EcoFlex service friendly. A light diode is fitted to the room
sensor, which flashes when there is a fault. Store this instruction book
carefully, so that it is easily accessible for later reference. Read through the
instruction book carefully before starting to use your pellet system.
Follow the instructions given in the instruction book carefully and carry out
maintenance and service as recommended.
Safety regulations
The following safety regulations should be taken into consideration when
handling, installing and using the boiler:
• Installation must be done according to applicable local standards and
regulation.
• Shut off the operation switch before carrying out any service or
maintenance on boiler or peripheral equipment.
• The casing over the pellet burner is an important part of the boiler’s
safety equipment and must always be fitted and secured when the
boiler is in operation.
• The power supply to the burner must always be shut off if the casing is
to be removed, for example when cleaning the burner.
• Never undermine safety through deactivating safety equipment.
• The boiler and its peripheral equipment are not to be washed down
with water.
• The flue gas ways and the boiler room air supply duct are not to be
blocked.
• When moving the boiler using a crane or similar, make sure that lifting
equipment, eyes and other components are undamaged. Never stand
or walk under a lifted boiler.
• In a closed system, a non closable safety valve (max 2.5 bar) approved
according to existing standards must be installed. See the section
“Hydraulic installation”.
This appliance is not intended for use by persons ( including children ) with
reduced physical, sensory or mental capabilities, or lack of experience
and knowledge, unless they have been given supervision or instruction
concerning use of the appliance by a person responsible for their safety.
Children should be supervised to ensure that they do not play with the
appliance.
Содержание ecoflex
Страница 2: ......
Страница 3: ...Installation and maintenance manual CTC EcoFlex Wood pellet boiler 162 105 01 4 2015 11 05 42 15 03 ...
Страница 53: ...53 CTC EcoFlex Installation 13 Electric diagram 230V 1N ...
Страница 54: ...54 CTC EcoFlex Installation 14 Electric diagram 400V 3N ...
Страница 56: ...56 CTC EcoFlex Installation Declaration of Conformity ...
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ...Enertech AB P O Box 309 SE 341 26 Ljungby Sweden www ctc se www ctc heating com ...