![CTC Union 588600001 Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/ctc-union/588600001/588600001_installation-and-maintenance-manual_2693331032.webp)
32
CTC EcoPart 600M
8. First start
1. Check that the heating boiler and system are full of water and have
been bled.
2. Check that all connections are tight.
3. Check that sensors and the radiator pump are connected to the power
source.
4. Energise the heat pump by switching on the safety switch (the main
switch).
Once the system has heated up, check that all connections are tight, the
various systems have been bled, heat is coming out into the system and
DHW is coming out at the tap locations.
9. Operation and
Maintenance
When the installer has installed your new heat pump, you should check
along with the installer that the system is in perfect operating condition. Let
the installer show you where the power switches, controls and fuses are
so that you know how the system works and how it should be maintained.
Bleed the radiators (depending on type of system) after around three days of
operation and top up with water if required.
9.1 Periodic maintenance
After three weeks’ operation and then every three months during the first
year. Then once a year:
• Check that the installation is free of leaks.
• Check that the product and system are free of air; bleed if needed –
see the section
Connection of brine system.
• Check that the brine system is still pressurised and that the fluid level in
the brine vessel is adequate/correct.
• The products do not require annual inspection for refrigerant leakage.
9.2 Operation stop
The heat pump is shut down using the operating switch. If there is a risk of
the water freezing, drain off all the water from the CTC EcoPart 600M.
Содержание 588600001
Страница 3: ...Installation and Maintenance CTC EcoPart 600M Modell 612M 616M 400 V 3N 162 305 09 2 14 08 2019...
Страница 16: ...16 CTC EcoPart 600M CTC EcoPart 616M UPML XL GEO 25 125 130 PWM 1 x 230 V 50 60 Hz...
Страница 26: ...26 CTC EcoPart 600M 7 4 Wiring diagrams 7 4 1 Cooling module A3...
Страница 27: ...27 CTC EcoPart 600M...
Страница 28: ...28 CTC EcoPart 600M 7 4 2 Cooling module A4...
Страница 29: ...29 CTC EcoPart 600M 7 4 3 Connection box 400 V 3N...
Страница 34: ...34 CTC EcoPart 600M...
Страница 35: ...35 CTC EcoPart 600M...
Страница 36: ...Enertech AB P O Box 309 SE 341 26 Ljungby Sweden www ctc se www ctc heating com 162 305 09 2 14 08 2019 012...