![CTC Union 588600001 Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/ctc-union/588600001/588600001_installation-and-maintenance-manual_2693331018.webp)
18
CTC EcoPart 600M
96 Level/expansion vessel
97
CTC filling kit
98 Shut-off valve
99 Filter
100 External filling pump
101 Mixing vessel
102 Brine pump
103 Evaporator
104 Safety valve 3 bar
5.2 Brine system schematic diagram
The diagram shows the main connection for the brine system. The filling
equipment is represented by the parts displayed with dashes. NB: Collector
hoses must have a bleeding facility as air pockets can occur. Always check
the filter (99) when filling and bleeding the brine system.
!
The mixing ves-
sel and filling pump
must be of an ade-
quate dimension.
5.1.1 Valves
To facilitate servicing of the cooling unit, shut-off valves must be fitted to
both the incoming and outgoing connections. Mount the valves (98d and
104) with the bifurcation so that you can later fill and bleed the collector
circuit.
5.1.2 Insulation against condensation
All pipes in the brine system must be insulated against condensation to
prevent the possibility of severe build-up of ice and condensation dripping.
104
102
103
98d
100
101
99
97
96
98c
98a
c
T
c
98b
Содержание 588600001
Страница 3: ...Installation and Maintenance CTC EcoPart 600M Modell 612M 616M 400 V 3N 162 305 09 2 14 08 2019...
Страница 16: ...16 CTC EcoPart 600M CTC EcoPart 616M UPML XL GEO 25 125 130 PWM 1 x 230 V 50 60 Hz...
Страница 26: ...26 CTC EcoPart 600M 7 4 Wiring diagrams 7 4 1 Cooling module A3...
Страница 27: ...27 CTC EcoPart 600M...
Страница 28: ...28 CTC EcoPart 600M 7 4 2 Cooling module A4...
Страница 29: ...29 CTC EcoPart 600M 7 4 3 Connection box 400 V 3N...
Страница 34: ...34 CTC EcoPart 600M...
Страница 35: ...35 CTC EcoPart 600M...
Страница 36: ...Enertech AB P O Box 309 SE 341 26 Ljungby Sweden www ctc se www ctc heating com 162 305 09 2 14 08 2019 012...