2-1
ProRACK 8020
Section 2 - Setting Up the System
Overview
This section describes the assembly of the ProRACK
System. Once everything is connected, the system will be
ready to power up and put to use.
You will mount the slide rails on the system chassis and
install the ProRACK in your 19” equipment rack. You will
also connect the power cord(s) to the power supplies at the
rear of the chassis.
Unpacking the System
Before proceeding, review this list:
•
The system unit
•
The slide rail assembly
•
Power cord(s)
Assembling the ProRACK
Checking the Cables
Remove the top of the chassis and perform a visual check of
all cabling. Make sure the SCSI cables and power
connectors, add-in boards and cabling are all firmly seated.
Replace the top and proceed with the installation.
If you are installing disk drives in to the chassis, refer to the
instructions for installing disk drives, given in section 3 of
this manual.