Product & Installation Manual: Sentry Barrier™
KEEPING
NZ SAFE
Installation Checklist
Contact CSP
®
for more information on this or other road safety products.
Job Number:
Location:
Client/Asset Owner:
Principal Contractor:
Installer:
Installed by:
Date
Inspected by:
Date
Item
Y
N
Ensure the posts are orientated in the correct direction and consistent with the terminal ends or
crash cushions.
The height of the finished rail should be 800 mm (±25 mm) above the finished ground level.
The height to the top of the posts should be 790 mm (±25 mm) above finished ground level. It
should be ensured that the post DOES NOT protrude above the W-Beam.
The posts are free from damage.
The correct Sentry Barrier™ Washer is installed and seated correctly in the back of the post.
All bolts are tightened snug.
The W-Beam must be level and aligned to the terminal end or crash cushion in accordance with
transition drawings.
Refer to Appendix F of the Product and Installation Manual for guidance.
Ensure posts are free of debris prior to installing the W-Beam.
The top edge of the W-Beam must align, both vertically and horizontally, between the Sentry
Barrier™ and the nominated terminal end in accordance with transition drawings.
Refer to Appendix F of the Product and Installation Manual.