![CSP Pacific SENTRY BARRIER Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/csp-pacific-0/sentry-barrier/sentry-barrier_product-and-installation-manual_2692906015.webp)
February 2021 |
Page
15
Ph 0800 655 200
or visit
www.csp.co.nz
Product & Installation Manual: Sentry Barrier™
KEEPING
NZ SAFE
Bill of Materials
Checklist per panel (3.81 m of barrier) installed
Yes
2x Sentry Barrier™ Posts (per W-Beam)
2x Sentry Barrier™ Bolt, Washer and Nut (one per post connection)
1x W-Beam
8x Splice Bolts and Nuts (at the end of W-Beam and overlapping the prior W-Beam)
Drilling or compactor suitable for foundation
String line and pegs
Measuring tape
Level
32 mm Wrench
32 mm Ring Spanner