INSTALLATION MANUAL
Southern Glass Green Energy Industrial Park,
Xinji Village, Machong Town, Dongguan, China.
Tel: 86-769-88288015 Fax: 86-769-88288160
www.csgpvtech.com
5A.
Parallel Connection
(+)
(-)
(+)
(-)
(+)
(-)
(-)
(+)
5B.
Series Connection
Figure 5.
Module Connections
(e)
Grounding:
Module frames should be connected to an earth ground for safety, protection from lightning and
related static discharge. Ground the modules with equipment grounding screws (Fig6) on each module and
mounting rails or some equivalent grounding method. The ground wire should be at least the same size as the
electrical conductors. An example of grounding method is shown in Fig 6.
1. Prepare eight 4mm stainless screws with 4mm stainless star washers, grounding conductor, ground wire
,
4mm spring washer and 4mm nuts on it. (
Step A
)
2. Screw the screws into the grounding holes, and tighten the screws with 4Nm. (
Step B, Step C, Step D
)
(+)
(-)
(+)
(-)
(+)
(-)
(-)
(+)