III. INSTALLATION CONDITIONS
PV module shall be used under the condition
described hereinafter:
(a) Mechanical condition
1. No vibration
2. No impact force
(b) Electrical condition
1. Maximum system operation voltage:
1000V for
all
series
solar module
N (number of modules) = Maximum
system voltage of module/ Open circuit voltage of module at standard
AM1.5G, 25 degrees temperature
condition,
Maximum parallel modules= The
connector current rating(25A)/Maximum system current of module
If there are more than 2 strings, that one string must be have a fuse, the fuse rating=the string
’
s current
rating
×
1.56
IV. INSTALLATION
(a) Unpack the module and check that the module’s glass surface is in good condition.
(b) Check the Junction box at the rear side of module. You can open the cover by using a screwdriver as shown in
Fig 2. Look over the cable connection polarity and the bypass diodes carefully (Fig 2), make sure they are in the
right position and no any damage or loose parts.
Fig 2.
Use a screwdriver to open the lid of the Junction Box