Crystal RCS1921R Скачать руководство пользователя страница 13

RCS1921R Rugged Router 

 

RCS1921R User Guide 

 

Page

 

11

 of 

18

  

 

 

Using Crystal Slides 

 

To install RCS1921R Router with Crystal Slides in an equipment rack, complete the following 

steps and see

 

Figure 2

 below: 

1.

 

Loosen adjuster screws. 

 

2.

 

Line up the top and bottom holes on the front & rear mounting ears at the desired level of 

the equipment rack, and attach to the rack using four (two per side) 10-32 x 0.50

screws provided (see #1, #2 and #5 in Figure 2). 

 

It may not be possible to line up all holes.  If more than three holes do not line up, 

please contact 

Technical Support

.  

3.

 

Tighten adjuster screws. 

 

4.

 

Line up the router side slots with the slides and gently push to install in the rack.  

 

5.

 

To secure the router when transporting or when extension of router is not necessary, screw 

two 10-32 x 0

to the middle hole of the front bracket ears (see #1 and #4).  

 

 

 

 

 

 

 

 

 

 

Crystal Slides Parts List 

ITEM 

DESCRIPTION 

  

FRONT MOUNTING EAR, SLIDE 

REAR MOUNTING EAR, SLIDE 

GUIDEBAR, T-SLOT SLIDE  

SCREW, PHIL TRUSS HEAD 10-

 

SCREW, PHIL TRUSS HEAD 10-

 

SCREW, 8-32 X 0.375  FHD 82D, SS 

Figure 2 

Not all chassis support Crystal Slides 

 

Table 2 

Figure 2

. Crystal Slides 

Содержание RCS1921R

Страница 1: ...CRYSTAL GROUP INC ALL RIGHTS RESERVED ISO 9001 2008 AS9100C 2009 CERTIFIED QMS DOC 00322 REV C RCS1921R Rugged Router User Guide The most trusted provider for operational deployable and high reliabili...

Страница 2: ......

Страница 3: ...E THANK YOU 3 SAFETY 4 ADVISORIES 4 HANDLING PRECAUTIONS 5 ELECTROSTATIC DISCHARGE ESD 5 BATTERY DISPOSAL 5 A CONTACT INFORMATION 6 CUSTOMER SERVICE HOURS OF OPERATION 6 TECHNICAL SUPPORT ASSISTANCE A...

Страница 4: ...CONNECTING TO A POWER SOURCE 12 POWERING THE ROUTER ON 12 E MAINTAINING THE PRODUCT 13 DRIVER UPDATES 13 CHASSIS ACCESS 13 CHASSIS VIEWS 14 F TROUBLESHOOTING 15 AVAILABLE WARRANTY 16 CRYSTAL GROUP LIM...

Страница 5: ...tisfied with their product choice Crystal products are designed to provide superior performance and reliability in the harshest environments Our company is ISO 9001 2008 and AS9100C 2009 certified QMS...

Страница 6: ...re used throughout this user guide to emphasize important information or to warn of potential hazards to the user or equipment These advisories each have a specific icon that will stand for one of the...

Страница 7: ...ents The chassis must be connected to an earth ground 2 Use antistatic padding on all work surfaces 3 Avoid static inducing carpet areas 4 Keep the electronic components in its static shield bag until...

Страница 8: ...y using one of the options below CUSTOMER SERVICE HOURS OF OPERATION 8 00 AM 5 00 PM Monday through Friday Central Time TECHNICAL SUPPORT ASSISTANCE AVAILABILITY 7 24 365 7 days a week 24 hours a day...

Страница 9: ...and alone unit The RCS1921R Router consists of an aluminum chassis enclosure a power supply and options for expansion module s SPECIFICATIONS Mechanical 1U Height 4 45 cm Width 41 9 cm Depth 33 cm Wei...

Страница 10: ...andard 120 240 VAC Military Standards For a complete list of Military Standards visit the Crystal Group website at http www crystalrugged com Commercial Standards Commercial standards are based on the...

Страница 11: ...rack frame to the floor or vehicle Elevated Operating Ambient Temperature if installed in a closed or multi unit rack assembly the operating ambient temperature of the rack contents may be greater tha...

Страница 12: ...holes do not line up on each side please contact Technical Support 2 Line up four holes on the front mounting ears at the desired level on the front of the equipment rack and attach to the rack using...

Страница 13: ...to line up all holes If more than three holes do not line up please contact Technical Support 3 Tighten adjuster screws 4 Line up the router side slots with the slides and gently push to install in t...

Страница 14: ...CE Please see Section C Installing the Product on page 9 for more information POWERING THE ROUTER ON After securely attaching the power connection press the Power On Off router which will be located o...

Страница 15: ...er precautions at all times when handling the unit and its components Please see Electrostatic Discharge section on Page 5 DRIVER UPDATES Contact Technical Support at one of the options listed on page...

Страница 16: ...21R Router Figure 4 Rear View RCS1921R Router The images above may not depict the product received CONSOLE PORT AUX PORT GROUND STUD POWER SWITCH POWER INPUT RESET USB 2 POWER CORD LINE 115V 18AWG 12...

Страница 17: ...when using the product please contact Technical Support at one of the options listed on page 6 Before calling please have the following information available to help expedite assistance 1 Unit serial...

Страница 18: ...cluded from this warranty are any products not provided by Seller Seller will however provide the labor to remove install and test excluded produ by Seller to the extent that the Buyer agrees to purch...

Страница 19: ...nterference at their own expense The following information is for FCC compliance of Class B devices The equipment described in this user guide generates and may radiate radio frequency energy televisi...

Страница 20: ...ROM THE BOARD DUE TO SPECIFIC OR CUSTOMIZED PRODUCTS IMAGES PRESENTED IN THIS USER GUIDE MAY NOT DEPICT THE PRODUCT THE CUSTOMER HAS RECEIVED CERTIFICATIONS AND LICENSES EACH PRODUCT MANUFACTURED WITH...

Страница 21: ......

Страница 22: ......

Отзывы: