-
7
-
3. Stock advice for R32 models
The warehouse should be bright, spacious, open, well ventilated, have ventilation
equipment and no fire source.
*VERY IMPORTANT* Heat pumps must be stored and transferred in a vertical position in its
original packaging. If this is not the case, the heat pump cannot be operated until a
minimum period of 24hrs has passed with the unit upright, before the unit can have the
electrical power turned on.
Smoking and the use of flames are prohibited near R32machine.
Water connections are not to be used as load bearing handles. The manufacturer does not accept
"ANY" responsibility for "ANY" damage to the water pipes.
4. Installation
4.1 Accessories list
Anti-vibration base, 4 pcs
Draining plug, 2 pcs
Water drainage pipes, 2 pcs
Winter Cover, 1 pc
Water connection assembly, 4 sets
(
2 sets 48.3mm, 2 sets 50mm )
Содержание CHP075PX
Страница 1: ......
Страница 2: ...Please read and understand ALL the instructions before installation and use...
Страница 6: ...4 2 Dimension unit mm 2 1 Model CHP075PX CHP095PX...
Страница 7: ...5 2 2 Model CHP115PX CHP135PX CHP165PX 2 3 Model CHP205PX CHP255PX...
Страница 8: ...6 2 4 Model CHP305PX...
Страница 11: ...9 Dry contact timer connection Timer Dry contact pump connection Water pump...
Страница 32: ...30 10 Exploded view 10 1 Model CHP075PX CHP095PX...
Страница 34: ...32 10 2 Model CHP115PX CHP135PX CHP165PX...
Страница 36: ...34 10 3 Model CHP205PX CHP255PX...
Страница 38: ...36 10 4 Model CHP305PX...
Страница 42: ...40...
Страница 44: ...42...
Страница 45: ...43 4 Parameter checking and setting Click Parameter then enter the password 0757...
Страница 47: ...45...
Страница 50: ......
Страница 51: ...A0211MPX02...