
Crystal Vision
Hardware installation
Smart Switch 3G User Manual R1.10
5
01/09/2016
2 Hardware installation
The Smart Switch 3G single height module is used with the RM53 and RM54 rear connectors,
which will fit into all Crystal Vision rack frames. All modules can be connected or removed
while the frame is powered, without damaging the board.
2.1 Module configuration
Smart Switch 3G
Link configuration and LEDs
There are 13 jumper links and three surface-mounted LEDs on the Smart Switch 3G. The
surface-mounted LEDs are not visible from the front of the frame and are included for
diagnostic purposes only.
Comment
J3-6
GPI
control
←
422
comms
→
Ethernet
comms
→
J9-12
na
na
na
J1
External reference input termination. 1-2 75R, 2-3 Hi Z
J2
Leave in position 1-2
→
J7 J8
Not used
PL6
2-3 (lower) selected IP address. 1-2 (upper) forced IP address 10-0-0-201
LED1
CPU configuration in progress
LED2
Ethernet Data
LED3
Ethernet Link
Note:
Links J1-12 have been factory set and should not require reconfiguring.