
18
Installation, Operation & Service Manual – Form 1707001 Rev1
Water filter installation
Note
A filtration installation is shown. Reverse Osmosis systems may require
additional plumbing.
Open the storage door more than 90 degrees.
Check if the pump pipe connector (1) is closed with a plug.
Install your filtration package inside the bottom, internal recessed area
using the bracket provided or by attaching the appropriate mounting
brackets for your system to the rear wall. The unit comes pre-drilled to
meet standard configurations. TAKE CARE NOT TO DRILL OR SCREW
INTO THE TOP OR SIDES AS IT MAY DAMAGE THE UNIT.
If installing a Reverse Osmosis system, there is a bulkhead fitting
provided for the drain connection.
Before connecting the filter kit to the icemaker inlet, make sure to flush
the filter system according to the manufacturer’s instructions.
If not installing filtration or if feeding the unit with previously treated water,
run a 1/4 OD water line from the inlet fitting on the left to the ice maker
inlet fitting on the right.
Turn the shutoff valve on and make sure there are no water leaks.
Turn the water selection switch (5) as indicated to use Regular Filter or
RO Filter.
Plug in the unit to reset/restart.
Water line to filters
Water line from filters to
ice maker
Bottled/POU switch
Bottled water inlet
R/O Drain (if
necessary)
Содержание CMFIWD001
Страница 1: ...Service Manual 100 115VDC Crystal Mountain Ice Water Cooler ...
Страница 3: ......
Страница 4: ......