Crysalli CP2000-R-UC-BH Скачать руководство пользователя страница 5

For CP2000-RUC-BH

CR-KIT-CPUC 

Install Kit for CP2000-UC to CBR-V2 Tower

112019

QTY

Part #

Usage

6

6' Insulated Trunkline 1/4" product

CP-4L14

Connects CP2000 Chiller to Draft tower w/re-circ

1

3/8 Tube x 9/26-24 Female Adapter

PSEI6012U9 quick connect fitting adaptor to a 3/8" anglestop water valve

2

JG 3/8" mpt to 3/8" Tube

PI011223S

fittings for CR-14FC Watet Filter head, inlet and outlet.

1

JG reducer, 1/2" stem to 3/8 tube

PP062012W Fittings for inlet of CR-14FCP filter system, pre-filter inlet

1

JG reducer 3/4" MPT to 1/2" tube

PSEI012026 Fittings for inlet of CR-14FCP filter system, pre-filter inlet

2

JG reducer, 3/8 stem to 1/4 tube 

PP061208W Reducing union, to connect product hoses to tower fittings

2

JG 90 1/4" smooth to 1/4 

PP220808W Optional Product water outlet connections on unit

5

JG 90 3/8" Smooth to 3/8 

PP221212W Optional Recirc outlet connections on unit and water filter

1

JG U shape union 3/8" to 3/8" 

PIUB12S

U bend to complete water re-circ circuit from trunkline at tower.

1

JG 3/8 to 3/8 Union 

PP0412W

Water inlet fitting. Union fitting for splicing in 3/8 hose

2

JG 1/2" mpt to 3/8" 

PI451214FS JG fittings for Shurflo Water Reg inlet and outlet

1

Water Pressure Reducer Valve, 50 psi

183-150-NF

Use after the water filter to regulate pressure feeding unit to 50

1

12' section of 3/8 OD Tube

PE-12-EI

12' Hose for Water Filter and Inlet connections

15

JG 3/8 Locking Clips

PIC1812R

Collet locking clip for 3/8" JG fittings

4

JG 1/4 Locking Clips

PIC1808R

Collet locking clip for 1/4" JG fittings

1

15' Role of Armaflex tape

insulation tape to wrap product and re-circ lines and tower

4

15" Zip Ties

For securing hose and water reg to wall. 

Fitting to hook up a CR-14FC Filter system to a Crysalli Countertop CP2000-UC-BH and Tower or Facuet

Water Pressure Reducer Valve with 1/2" PI451214FS JG fittings screwed on. 

CBR-V# Tower comes with super seal fittings for SS Tubes 

Insulate Wrap all exposed fittings and lines at the chiller and tower 
 with the Armaflex insulation tape to prevent sweating of the hoses and temp loss. 

Optional Accessory Avaliable: 

CR-LBS10-JG, Inline Water Leak Detector and Auto Water Shutoff. 

For questions or assistance with install contact Crysalli 510-732-0100 or your local Distributor. 

Description

1/4" water inlet 

hose with 3/8" 
smooth end JG 

fitting. 

CO2: 1/4" 

braded hose 
with ss fitting

3/8" Inlet and 

Outlet fpt. Use JG 

PI011223S on 

Connect 

here

Always

complete the 

recirc loop

and wrap fittings 

and hose with 

inualted tape

Clear Hose is Overflow

Use PSEI6012U9 angle 

stop adaptor 

CR-4L14 Trunkline:

1/4" Product hoses

3/8" Recirc hoses

Water Pressure Reducer

with 3/8 JG fitting 3/8 OD 

hose hookup. 

Содержание CP2000-R-UC-BH

Страница 1: ...1 CP2000 R UC BH Installation Guide Sparkling Still Chilled Undercounter System CP2000 R UC BH undercounter chiller With CBR or LIT Series Draft tower REV_1018 www Crysalli com ...

Страница 2: ...andles are screwed down tight front facing and on the appropriate faucet Sparkling water cold carbonated and tastes clean and pure Run a few liters of water is carb pump cycling on and flow consistent without gassing out Still Water cold and consistent flow Tastes clean and pure Flow adjustment on faucets set and knob tightened down so flow rate appropriate and locked in Connections to tower made ...

Страница 3: ...ings to the Water Filter System and mount it vertically in an accessible location Locate and attached the 50 psi water pressure reducing valve on the outlet side plumbing of the filter system See page 11 for filter system detail 7 Unwrap the hoses and electrical cord coming out of the chiller Make water inlet and CO2 inlet connections Route over flow drain to floor sink Run Electrical cord to plug...

Страница 4: ... Chilled Water and Carb Water lines to the bulk head connections on chiller Connect the U bend JG fitting at the tower end of the trunkline to loop the red recirc lines And connect these lines to Recirc bulk head fittings at the chiller ...

Страница 5: ... after the water filter to regulate pressure feeding unit to 50 1 12 section of 3 8 OD Tube PE 12 EI 12 Hose for Water Filter and Inlet connections 15 JG 3 8 Locking Clips PIC1812R Collet locking clip for 3 8 JG fittings 4 JG 1 4 Locking Clips PIC1808R Collet locking clip for 1 4 JG fittings 1 15 Role of Armaflex tape insulation tape to wrap product and re circ lines and tower 4 15 Zip Ties For se...

Страница 6: ...1 8 Overall 2 Tower Hole on pan 10 3 8 x 8 1 2 Drain Pan 1 2 Dia Copper Drain Stub CBR V1 1 3 8 Hole CBR V2 1 1 2 Hole CBR V3 1 7 8 Hole LIT V2C 2 Hole LIT V3C 2 Hole RDP 3SSQ for use with CBR V3C W Tower LIT V3C Tower Specs 15 x 18 1 8 Overall 2 Tower Hole on pan 13 3 8 x 10 1 2 Drain Pan 1 2 Dia Copper Drain Stub 2 Threaded stud for mounting 10 24 Thread with Locking Nut and 3 x1 SS Mounting Str...

Страница 7: ...w fittings to connect the Product line from the trunkline to the tower It is easiest to attach these fittings to the product tubes of the trunkline first using the red locking clips then connect them to the Superseal fittings on the tower tubes see CR 4L38 Trunkline Tower End Connections page SI030812S Superseal Elbow loosen collet nut push into SS tube and tighten collet nut Step 2 Step 1 Locate ...

Страница 8: ...ose from the filter to the 3rd tube for ambient water After testing the system for leaks wrap all exposed hoses and fittings with the Insulated tap found in the UCM install kit Step 3 Step 1 Locate the CR 4L14 Trunkline 6 will be included with the CPUC install kit And Prep both ends for connection to the Chiller and Draft tower This trunkline typically doesn t need to be cut shorter the extra leng...

Страница 9: ...ack to lock in Pull shank nut to faucet and hand tighten Tighten shank nut with Faucet Wrench Locate the Faucet Bodies Handles and Faucet Wrench The faucet bodies attach to the shanks that are pre attached to the tower and leak tested When attaching the faucet body to the shank be sure the faucet is properly aligned before tightening it down Adjusting the faucet angle when attached to the shank ca...

Страница 10: ...Q1231 Faucets used on the CBR V1 CBR V2 CBR V3 LIT V2C and LIT V3C dispensing towers will need the flow rate adjusted and set To set the flow rate lock the flow adjustment knob make sure system is on and cold and CO2 open Locate the black plastic three pronged adjustment knob on the right side of the faucet and check that you can freely turn it you may need to loosen the Phillips head set screw a ...

Страница 11: ...ack PE 12 EI Tubing Cut this to the appropriate length for inlet and outlet needs Your install kit may have some 1 4 braided hose in it That hose is for the CO2 only Do Not use the braided hose on JG fittings NOTE Always reference local plumbing codes for the use requirement of a back flow preventer as well as type and location within the system Locate the 183 150 NF 50 PSI Water Pressure Reducing...

Страница 12: ...e it should be routed to a floor sink if accessible and positioned per plumbing code Place the unit in the cabinet space with at least 4 of space behind it for clearance for the trunkline bundle connections and chiller vents louvers on the side panels Do not block any of the ventilated panels on the chiller Install CR TFB1 Fan Box in cabinet at this time if using one Locate bundled Electrical cord...

Страница 13: ...CP2000 R UC BH has four bulk head outlet connections to attach the trunkline too Two horizontal 3 8 connections for the red striped re circ lines and two 1 4 vertical connections for the Product water lines Still Chilled water is marked PLAIN WATER Sparkling Water is marked CARB WATER With your trunkline prepared with the elbow fittings attached as described above you can now attach it to the chil...

Страница 14: ...1SN Secondary High Pressure CO2 Regulator to regulate Flare Nut with Nylon Washer in it CR 3741 Route the Clear Over Flow Water Bath Drain hose from the back of the unit to a floor sink or floor drain The Water Bath must be filled with water for the system to work and build an Ice Bank This water is not used for consumption it is only used to form an Ice Bank around the refrigeration coils and chi...

Страница 15: ...dling instructions from the CO2 tank supplier CR 3741 High Pressure CO2 Regulator 0 160 PSI Attaches to 5 100 lb CO2 tanks Set to 75 PSI Note Low Pressure Beer Regulators 0 50 psi will not work properly with Crysalli Common CO2 Tank Cylinder sizes in Commercial use Use with Primary High Pressure Reg CR 3741 Common Bulk CO2 Tanks Use with Secondary High Pressure Reg CR T5261SN 27 5 8 8 47 Output Pr...

Страница 16: ...ment for more details on maintaining the faucets Check CO2 level at CO2 tank Monthly Check for good water pressure at the water filter system by running water from flush valve on filter Visually check pre filter in clear bowl on water filter system if applicable to determine if it needs replacing Use only EPC5 10 replacement pre filter cartridge Quarterly Check the water bath level either top off ...

Отзывы: