Appendix A
A-3
3) Place the main beam in between the two side supports and slide the main beam mounting hardware
into place. Be sure the winch faces the side of the base assembly with the single rear post mounted
to it. Do not fully tighten the hardware down.
Note: This is step takes two people to complete.
4) Slide the main beam side supports into place resting against the main beam making sure that the
main beam is centered onto the base assembly.
Main Beam
Main Beam
Side Supports
Содержание PT415
Страница 1: ...PT415 Helium Reliquefier INSTALLATION OPERATION and ROUTINE MAINTENANCE MANUAL...
Страница 4: ...1 1 Section 1 Overview...
Страница 10: ...2 1 Section 2 Warranty...
Страница 13: ...3 1 Section 3 Safety...
Страница 20: ...4 1 Section 4 Inspection and Unpacking...
Страница 24: ...5 2 Section 5 Specifications...
Страница 39: ...Specifications 5 15 Figure 5 8 System I O wiring diagram Internal Supply Local Mode...
Страница 40: ...Specifications 5 16 Figure 5 9 System I O wiring diagram Internal Supply Remote Mode...
Страница 41: ...Specifications 5 17 Figure 5 10 System I O wiring diagram External Supply Local Mode...
Страница 42: ...Specifications 5 18 Figure 5 11 System I O wiring diagram External Supply Remote Mode...
Страница 45: ...6 2 Section 6 Installation...
Страница 55: ...7 1 Section 7 Operation...
Страница 68: ...8 1 Section 8 Routine Maintenance...
Страница 77: ...Appendix A A 1 Figure A 1 Reliquefier Main Assembly Drawing...
Страница 89: ...Appendix B Spray Lubricant Instructions...