Appendix A
A-11
5) Adjust the lower bracket on the stand so that the drain leg has enough clearance to avoid damage.
Apply the brake on the lower bracket bearing. Adjust the upper bracket so that it is approximately 24"
from the bottom bracket.
6) Carefully mount the Reliquefier on the lower mounting bracket with the drain leg located opposite the
vertical post on the stand.
7) While holding the Reliquefier, lower the upper bracket so that the hole on the upper bracket aligns
with the hole on the base plate.
8) Reinstall the screw that was removed in step 4. For ease of assembly, do not tighten the screw more
than a few threads.
Содержание PT415
Страница 1: ...PT415 Helium Reliquefier INSTALLATION OPERATION and ROUTINE MAINTENANCE MANUAL...
Страница 4: ...1 1 Section 1 Overview...
Страница 10: ...2 1 Section 2 Warranty...
Страница 13: ...3 1 Section 3 Safety...
Страница 20: ...4 1 Section 4 Inspection and Unpacking...
Страница 24: ...5 2 Section 5 Specifications...
Страница 39: ...Specifications 5 15 Figure 5 8 System I O wiring diagram Internal Supply Local Mode...
Страница 40: ...Specifications 5 16 Figure 5 9 System I O wiring diagram Internal Supply Remote Mode...
Страница 41: ...Specifications 5 17 Figure 5 10 System I O wiring diagram External Supply Local Mode...
Страница 42: ...Specifications 5 18 Figure 5 11 System I O wiring diagram External Supply Remote Mode...
Страница 45: ...6 2 Section 6 Installation...
Страница 55: ...7 1 Section 7 Operation...
Страница 68: ...8 1 Section 8 Routine Maintenance...
Страница 77: ...Appendix A A 1 Figure A 1 Reliquefier Main Assembly Drawing...
Страница 89: ...Appendix B Spray Lubricant Instructions...