![Crown GMT-10-10 Скачать руководство пользователя страница 10](http://html.mh-extra.com/html/crown/gmt-10-10/gmt-10-10_installation-and-operation-manual_2690080010.webp)
INSTALLATION AND OPERATION MANUAL, DIRECT STEAM KETTLES MOUNTED ON GAS
BOILER CABINET BASE, GMT-6, GMT-10, GMT-6-6, GMT-10-6, GMT-10-10
PART NUMBER 10072R1
10
2005-09-21
WARNING: Never use an open flame to check for gas leaks. Check
all connections for leaks using soapy water before use.
ELECTRICAL CONNECTIONS
WARNING: Do not connect the appliance to the electrical supply until
after the gas connection has been made.
Refer to the electrical diagram located inside cabinet on door.
When making electrical connections, use copper wire suitable for at least 200°F (90°C). The
steamer must be grounded in accordance with the National Electrical Code or applicable local
codes.
2.0 INSTALLATION INSTRUCTIONS
LOCATION
The installation location must be kept free and clear of combustibles. Do not obstruct the flow
of combustion and ventilation air. Clearance from combustible construction must be a minimum
of 3 inches from the sides and 6 inches from the back. The appliance should be installed on a
noncombustible floor. Provide adequate clearances for cleaning, maintenance, service and
proper operation.
Sufficient air should be allowed to enter the room to compensate for the amount of air removed
by any ventilating system and for combustion of the gas burners. Do not obstruct the air flow
into and around the appliance. Do not obstruct the flow of flue gases from the flue duct located
at the rear and above the cabinet. Position the appliance in its final location. Check that there
are sufficient clearances to service the controls, for door swings, etc., so there will be no
problem in making the required supply and drain connections.
Allow enough space between any other piece of equipment or a wall for service access.
Service on the cabinet base may require access to the left and/or right side panels.