INSTALLATION & OPERATION MANUAL 10070 REV 0 (04/21)
PAGE
7
OF32
G
as
F
ired
S
team
T
ilting
K
ettles
WARNING
Do not connect the kettle to the electrical supply until after the gas connection has been made.
I
NSTALLATION
W
ater
C
onnection
On units equipped with an optional water fill valve connect a water line (minimum 1/4”) to the valve with a 1/4” NPT female fitting.
Units with dual (hot and cold) valves must have the hot water line connected to side with the hot water valve (red) and cold water
line to the cold water valve (blue). Plastic or rubber hose is not recommended, as it may melt against the hot kettle side.
E
lectrical
C
onnection
WARNING
ELECTRICAL GROUNDING INSTRUCTIONS
This appliance is equipped with a three-prong (grounding) plug for your protection against shock hazard
and should be plugged directly into a properly grounded three-prong receptacle. Do not cut or remove the
grounding prong from this plug. (120V units only).
1. 120 VAC - 60 Hz - Single Phase
Units with this electrical rating are factory supplied with a three-wired cord and three-prong plug which fits any
standard 120V, three-prong grounded receptacle. A separate 15 amp supply is needed for each unit.
2. 208/240 VAC - 60 Hz - Single and Three Phase
Units with this electrical rating are factory equipped with a transformer. To connect supply wires, remove cover from right
console. Route supply wires and ground wire through the hole in the console with a strain relief fitting. Connect wires
to the terminal block in the rear of the right console. Connect ground wire to lug. Replace cover. Three-phase units are
wired as above, using only two supply wires. The third supply wire is not connected and must be properly terminated.
3. 220 VAC - 50 Hz - Single Phase
Units equipped with this voltage ratings should be wired exactly as in (Step 2) above.
P
erformance
C
heck
The following items should be checked before or within the first 30 days of operation by a qualified service technician.
1. Verify correct gas type against rating plate on unit.
2. Verify correct voltage, cycle and phase against rating plate on unit.
3. Gas pressure.
4. Internal gas connections.
5. Internal electrical connections.
6. Burners - adjustment and ignition.
7. Thermostat - cycle for operation check.
8. Gas supply valve - check for operation.
9. Check hinge and lid assembly.
10. Draw-off valve - check operation.
11. Advise user on cleaning procedure.
Содержание GLT-20
Страница 29: ...INSTALLATION OPERATION MANUAL 10070 REV 0 04 21 PAGE 29 OF32 Gas Fired Steam Tilting Kettles Notes Notes ...
Страница 30: ...INSTALLATION OPERATION MANUAL 10070 REV 0 04 21 PAGE 30 OF 32 Gas Fired Steam Tilting Kettles Notes Notes ...
Страница 31: ...INSTALLATION OPERATION MANUAL 10070 REV 0 04 21 PAGE 31 OF32 Gas Fired Steam Tilting Kettles Notes Notes ...