44
KEY #
DESCRIPTION
QTY. OR
CROWN PN
QUANTITY PER BOILER OR CROWN PART NUMBER
FSZ080
FSZ100
FSZ130
FSZ160
50
BECKETT OIL BURNER ASSY (NOTE 1)
1
42080B
42100B
2
41130B
41160B
50
RIELLO OIL BURNER ASSY (NOTE 1)
1
42080R
42100R
2
41130R
41160R
51
HONEYWELL R8285D5001 W/ MOLEX CONNECTOR
9601913
1
1
1
1
52
PRESSURE GAUGE
95-070
1
1
1
1
53
PRESSURE LIMIT, HONEYWELL L404F1367
3503800
1
1
1
1
54
SYPHON, 1/ 4” NPT X 1-7/8” X 3-1/2” X 90
950058
1
1
1
1
55
CG450 PROBE LOW WATER CUT-OFF
450450
1
1
1
1
56
GAUGE GLASS SET, 6” CONBRACO 21-104-10
950079
1
1
1
1
57
LIMIT, HONEYWELL L4006A2015
35-3510
1
1
1
1
58
WELL, 1/2” NPT X 3”
35-1006
1
1
1
1
60
3/4” NPT X 3” LONG NIPPLE
95-027
1
1
1
1
61
3/4” NPT 90° ELBOW
95-057
1
1
1
1
62
3/4” NPT X 8” LONG NIPPLE
950008
1
1
1
1
63
3/4” NPT SAFETY VALVE, 15 PSI, CONBRACO 13-512-B15
95-079
1
1
1
1
64
1-1/2” NPT X 3” NIPPLE
950023
1
1
1
1
65
1-1/2” NPT CAP
950107
1
1
1
1
66
1-1/4”NPT X 5” NIPPLE
95-043
1
1
1
66
1-1/2” NPT X 5” NIPPLE
950025
1
67
1-1/4” X 1-1/4” X 3/4” NPT REDUCING TEE
95-100
1
1
1
67
1-1/2” X 1-1/2” x 3/4” NPT REDUCING TEE
950019
1
68
3/4” NPT DRAIN VALVE
95-041
1
1
1
1
*
BAROMETRIC DRAFT CONTROL
1
13-020
13-020
13-020
13-018
*
FSZ STANDARD WIRING HARNESS
9601910
1
1
1
1
*
FSZ PRESSURE LIMIT HARNESS
9601911
1
1
1
1
*
FSZ LWCO HARNESS
9601912
1
1
1
1
* NOT SHOWN
1. PART NUMBERS PROVIDED ARE FOR FULLY CONFIGURED BURNERS AND INCLUDE PRIMARY SAFETY CONTROL, NOZZLES, BURNER
CORD ASSEMBLIES AND (WHERE APPLICABLE) LOW FIRING RATE BAFFLES.
2. BURNER ASSEMBLIES FOR THE FSZ100 ARE PACKAGED WITH 2 SECOND PASS BAFFLES PN 410008.
Содержание FSZ080
Страница 2: ......
Страница 14: ...12 FIGURE 6 4 ALLAIR FROM OUTDOORS USING HORIZONTAL DUCTS INTO BOILER ROOM...
Страница 18: ...16 FIGURE 8 1 STEAM BOILER PIPING FOR GRAVITY RETURN...
Страница 26: ...24 FIGURE 10 2 TWO PIPE GRAVITY FEED SYSTEM NOT RECOMMENDED FIGURE 10 3 TWO PIPE LIFT SYSTEM...
Страница 29: ...27 FIGURE 11 0 WIRING CONNECTIONS DIAGRAM STEAM CG450 PROBE LWCO...
Страница 30: ...28 FIGURE 11 1 CONNECTIONS WIRING DIAGRAM FOR BURNER SPECIFIC PRIMARY CONTROL...
Страница 31: ...29 FIGURE 11 2 INDIRECT WATER HEATER FIELD WIRING...
Страница 41: ...39 Notes...
Страница 43: ...41...
Страница 45: ...43...
Страница 47: ...45...
Страница 51: ...Notes...