Owner's Manual
VE-1P Vertical Edger
Page 23 of 33
SECTION 6
MAINTENANCE INSTRUCTIONS
Disconnect the main power to the edger before performing any
maintenance. Failure to do so could result in serious injury or death.
SPINDLE MOTOR
To replace the spindle motor;
1)
Shut off the main power to the edger and disconnect the wiring.
2)
Remove the four screws and washers that attach the wheel to the motor
spindle. Remove the spindle hub bolt. Remove the spindle hub using a
suitable wheel puller. Remove motor slinger and rubber curtain assembly.
3)
Remove the four hex head screws and washers that secure the motor to the
base plate.
4)
Install new motor by reversing this procedure.
COOLANT SYSTEM
To ensure optimum performance, this procedure must be done after 8 hours of
operation;
1)
Drain and clean the coolant tank and the pump (see ADDENDUM, PUMP
MAINTENANCE, page 32).
2)
Flush the lines and the coolant pan in the center section below the grinding
(polishing) wheel.
3)
After cleaning the tank, refill it with a mixture of 1 part of CRL Cat.
No. 2651005
coolant, or equivalent and 100 parts of water, or as
recommended. For mixing purposes, the approximate capacity of the
coolant tank is 8 gallons (30 ltrs), leaving a 1” (13mm) head space. The
coolant concentrate improves the finish of the grinding (& polishing)
operation and inhibits rust formation on the parts of the edger.