
Wall Mount LCD Controller
Crestron
APAD
Mounting Options for the APAD (continued)
PRE-
CONSTRUCTION
OPTION
POST-
CONSTRUCTION
OPTION
MODEL
NUMBER
DOCUMENT
NUMBER
Trim Mount Kit
(accessory)
TMK-1000L
6063
Wall Mount Kit – Mud
WMKM-1000L
6062
Wall Mount Kit – Trim
WMKT-1000L
6063
Wall Mount Kit – Bracket *
WMKB-1000L
6283
*One set of brackets is supplied with the APAD
NOTE:
Pre-construction refers to framed walls prior to hanging drywall.
Post-construction refers to framed walls with drywall hung.
The only tools required for the procedures presented here are masking tape (or
equivalent), a gypsum board saw (or equivalent), and a #1 Phillips tip screwdriver.
The following procedures are based on the use of the supplied screws and brackets
for post-construction installation.
Mounting the APAD
The APAD is designed for mounting in a wall or lectern. Two overlay cutout
templates (0V40087) are supplied. One is in the shape of the required opening; the
other is similar to a frame, with the inner area of the frame the shape of the required
opening. (Refer to the following diagrams.) Use the most convenient template.
Mounting Parts Supplied with the APAD
PART DESCRIPTION
QUANTITY
Screw #4-40 x 1-½”, Pan Head
4
Mounting Bracket
2
Overlay Template Cutout
1
Four-pin Connector Plug
1
NOTE:
The following drawings are not to scale. Do not attempt to use them to
prepare the hole in the mounting surface.
8
•
Wall Mount LCD Controller: APAD
Operations & Installation Guide – DOC. 6455
Содержание APAD
Страница 1: ...Crestron APAD WallMountLCDController Operations Installation Guide ...
Страница 4: ......