
Regulators repair and maintenance
6
MC9 1
st
stage
• Annual replacement
January 2009
Rev. MC9/B Ed.C/13
•
Cressi-Sub recommends complete regulator maintenance at least once a year,
or more frequently in the case of particularly intense use.
•
Maintenance must include replacement of all components provided in the
annual equipment maintenance kit.
•
The special tools for maintenance of this equipment are illustrated in a section
•
Metal parts must be washed with hot water and neutral detergent and rinsed
in fresh water. Any concretions must be removed using ultrasound cleaning or
with diluted acid solutions, always followed by long and thorough rinsing
under running water.
•
Do not use acids or solvents on rubber components.
•
The new ORs must be greased with a thin layer of silicon grease: this
procedure reduces to a minimum the risk of damage during assembly.
•
The metal threading can be lubricated with grease on the first two rings of
threading.
Содержание MC9
Страница 8: ...Regulators repair and maintenance 8 1 stage MC9 Special tools January 2009 Rev MC9 B Ed C 13 ...
Страница 11: ...Regulators repair and maintenance 11 MC9 1st stage INT disassembling phases January 2009 Rev MC9 B Ed C 13 ...
Страница 38: ...Riparazione e Manutenzione Erogatori 38 MC9 1st stage INT assembling phases January 2009 Rev MC9 B Ed C 13 ...
Страница 57: ...Regulators repair and maintenance 57 MC9 1st stage setting D 1 bar January 2009 Rev MC9 B Ed C 13 ...
Страница 58: ...Regulators repair and maintenance January 2009 Rev MC9 B Ed C 13 58 MC9 1st stage Service records Download Tab ...