
Riparazione e Manutenzione Erogatori
55
MC9 1
st
stage setting
stage setting procedures, referring to the picture on
• Connect the setting pressure gauge with one of the first stage LP
ports
• Connect the whole regulator (including both 1st and 2nd stages)
with a 200 bars pressurized tank, or with an equally pressurized
workbench.
•
Note: even though the regulator is overbalanced (that is, the
intermediate pressure increases as tank pressure decreases), it's a
good idea to calibrate the first stage to 200 bar to properly control
how the regulator functions. Intermediate pressure will rise slightly
as pressure in the tank drops (circa + 0.6 bar at tank 50 bar).
• Turn slowly the air valve on, while pressing the second stage air
outlet button. Do that some times more.
January 2009
Rev. MC9/B Ed.C/13
Содержание MC9
Страница 8: ...Regulators repair and maintenance 8 1 stage MC9 Special tools January 2009 Rev MC9 B Ed C 13 ...
Страница 11: ...Regulators repair and maintenance 11 MC9 1st stage INT disassembling phases January 2009 Rev MC9 B Ed C 13 ...
Страница 38: ...Riparazione e Manutenzione Erogatori 38 MC9 1st stage INT assembling phases January 2009 Rev MC9 B Ed C 13 ...
Страница 57: ...Regulators repair and maintenance 57 MC9 1st stage setting D 1 bar January 2009 Rev MC9 B Ed C 13 ...
Страница 58: ...Regulators repair and maintenance January 2009 Rev MC9 B Ed C 13 58 MC9 1st stage Service records Download Tab ...