background image

Trendsetter 400/800

4

Trendsetter 400/800

Operator Maintenance and Operations

1

2

3

4

5

6

7

8

Operations

Turn on the output device

4

These operations are required for some of 
the maintenance procedures below.

Turn off the output device

4

Reset the output device

9

Maintenance

Work to 

Be Done

How 

Often

Date Work 

Completed

Exterior surfaces

Clean

Weekly

Load ramp

1

Clean

Plate roller *

8

Clean

Monthly

Edge detection strip *

7

Clean

Every three 
months

Compressed air supply 
fi lters:

Three 
months or 
as needed

5 micron fi lter *

2

Replace

0.01 micron fi lter *

3

Replace

Air intake fi lter *

5

Replace

Universal Debris Removal 
Cabinet (UDRC) fi lter **

6

Replace

As needed

N/A

* Procedures for these items are included in this visual quick reference guide.
** Media dependent

Note:  This document is not intended as a substitute for the 

Trendsetter 400/800 

Operator Manual

. Refer to the operator manual for detailed procedures.

Software may display differently depending on the version of Print Console in use.

9

Содержание Trendsetter 400

Страница 1: ...www creo com Copyright 2005 Creo Inc All rights reserved Internal 732 00035A EN RevA Visual Quick Reference English Trendsetter 400 800 653 00953A EN A April 2005...

Страница 2: ...erator Action Imaging Light Flashing green Wait the device is imaging the plate Load Light Steady green Place a plate on the load ramp The green light stays on until the plate is unloaded Error Light...

Страница 3: ...output device receives the job in Print Console The output device receives the job Prinergy Brisque TIFF Work ow The output device receives the job in Print Console In Prinergy click OK to submit the...

Страница 4: ...e load ramp 4 Lower the plate gently until it touches the registration pins 5 Align the plate on the load ramp 6 Press the Start button 7 Unload the plate 8 The load light ashes green The imaging ligh...

Страница 5: ...Clean Monthly Edge detection strip 7 Clean Every three months Compressed air supply lters Three months or as needed 5 micron lter 2 Replace 0 01 micron lter 3 Replace Air intake lter 5 Replace Univers...

Страница 6: ...direction and pull down 2 5 micron lter Reattach the bowl 6 Replace the O ring if necessary 5 Clean inside the bowl 4 Turn on the compressed air 7 Air pressure rises to 80 psi Tab Bowl Pull the lter t...

Страница 7: ...a lint free cloth with water and slide the cloth over the plate roller 3 Dampen a cloth with isopropanol and swipe it along the strip once in one direction only 3 To close the panels a Pull down the f...

Страница 8: ...5 0700 Remove the right end access panel a Use a athead screwdriver to rotate both screws 90 counterclockwise 1 Remove the old air intake lter from the frame 2 Air intake lter Clean the air intake lte...

Страница 9: ...debris left behind 7 In Print Console click Resume 8 Reposition the trailing edge clamps a Align the trailing edge clamps with the leading edge clamps 9 Close the front panel then close the top panel...

Отзывы: