Ridgefield Play Floor - 19810-200B (04/20)
Copyright 2010, Creative Playthings - Printed in U.S.A.
Page 3
Page 3
STEP FOUR – Brackets
STEP FIVE – Stringers & Cleat
Hold an Access Bracket against a middle post aligned
with the open hole. Mark the position of the other hole
in the bracket on the adjacent Sandbox Back.
Drill a 3/8" diameter hole through the board at the
mark. Secure the Bracket to the post using a 5/16 x
3" Hex Bolt Assembly. Secure the
Bracket to the Sandbox Back
using one 5/16 x 1-1/2" Hex
Bolt Assembly.
Repeat with the other
Bracket at the other side of
the gym.
Locate one Cleat from the Williamsburg Play Floor box.
Secure the four Porch Stringers (C) between the Transi-
tion and the Sandbox front using 5/16 x 3" Lag Screws
with flat washers across the front.
Use the included 5/16 x 5-1/2" Lag Screws and Flat
Washers to fasten the Williamsburg Floor Cleat through
the Transition into the Porch Stringers.
If the porch play floor is to be installed without
the adjacent tower play floor, use 5/16 x 3-1/2"
Lag Screws in place of the 5/16 x 5-1/2" Lag
Screws. (These extra 5/16" x 3-1/2" Lag Screws
are not included.)
STEP SIX – Deck Boards
Set one Floor Board (B) atop the Floor Transition with
the edge of the Floor Board aligned with the edge of the
Transition.
Evenly space the rest of the Floor Boards between the
first board an the Sandbox End at the front of the tow-
er. Secure each Floor Board using six #10 x 2" Deck
Screws. Use #10 x 1-5/8" Deck Screws in the places the
screws might encounter the Lag Screws at the end of
the Porch Stingers.
STEP SEVEN – Hole Caps
Gather the Hole Caps removed in step one. Re-insert the Hole
Caps into the accessible counter-bored holes to cover the
hardware.
A
A
B
B
5/16 x 3-1/2"
Hex Bolt
5/16 x 1-1/2"
Hex Bolt
Align
Edge
Sandbox
Back.
C
C
5/16 x 3-1/2"
Lag Screws
5/16 x 5-1/2"
Lag Screws
Wmsbg Floor
Cleat from the
Main Tower
Play Floor