background image

Ridgefield Play Floor - 19810-200B   (04/20)

Copyright 2010, Creative Playthings - Printed in U.S.A.

Page 2

Page 2

STEP THREE – Reinstall Sandbox

STEP TWO – Install Transition

STEP ONE – Preparation

A

A

C

C

Remove and 
keep at hand.

Remove and 

dispose.

Fasten  the  Floor Transition  (A)  to  each  middle  post 
through the bottom hole using 5/16 x 4" Hex Bolt as-
semblies as shown.
A Hex bolt assembly consists of a Hex Bolt, Lock Wash-
er, Flat Washer, and Weld Nut.
Align the transition so the holes at the end of the part 
are closest to the bottom edge. 

Restore  the  Sandbox  Backs  to  the  original  posi-
tions  using  the  original  hardware.  Please  note: 
there is only a place for one lag screw to secure 
the end of each part.

Using a putty knife or other flat blade, carefully remove 
the hole caps covering the central holes on the sandbox 
front of the porch section of the Ridgefield gym. Save 
the hole caps for later use.
Drill 3/8" diameter holes through the center of the 1" 
counter-bores in the positions shown at right.
Remove  the  Sandbox  Center,  it  won't  be  needed.  Re-
move  the  Sandbox  Back  boards  at  each  end  of  the  
porch  base. They  will  be  reinstalled.  Save  all  fasteners 
for later use.

5/16 x 3" 
Lag Screw 
(removed 
earlier)

5/16 x 4" 
Hex Bolts 
(removed 
earlier)

5/16 x 4" 
Hex Bolts 
(removed 
earlier)

Middle 
Post

Отзывы: