background image

PARTS

B

A

C

D

E

F

G

J

* Not Pictured

INSTRUCTIONS

7 FT. SWING BEAM

H

This manual documents the 

assembly of a 4 Position Swing 

Beam. The 3 Position is similar. 

See the instructions for the 

Gym Tower for information on 

proper ground cover.

All hardware on this set 

is specially coated for 

corrosion resistance.

If non-Creative Playthings 

hardware is used, it MUST 

be galvanized or stainless 

steel.

Premium Pine 7 Ft. 4 Position Swing Beam
63058-202  4 Position Swing Beam
63059-212  7 ft Swing Beam Legs
50546-777  3 Swings, 1 Trapeze
Premium Pine 7 Ft. 3 Position Swing Beam
63061-202  3 Position Swing Beam
63059-212  7 ft Swing Beam Legs
AA934-204  2 Swings, 1 Trapeze

Parts for the optional Glider:
50545-555  Glider Bracket Pack
AA911-342  Chained Glider

A  1  40587-102  4 Position Swing Beam Assembly

     

 OR

*  1  40586-102  3 Position Swing Beam Assembly

B  1  32620-102  Angle Brace 4 x 4 x 16-7/8"

C  1  32625-102  Leg Brace 4 x 4 x 58"

D  2  40447-102   Leg Assembly, 7ft. Swing Beam 

E  1  14175-400  T-Bracket, Green

F  1  14176-400  Beam Retainer, Green

G  1  14162-400  8" L-Brace, Green

*  2  14174-400  Beam Bracket (in Hardware Bag)

*  2  36515-102  Stake 2 x 2 x 18"

H  1  40311-400  Trapeze Assembly

J  3  40321-400  Sling Swing Assembly (2 Swing for 3 Position Beam)

 

1  50395-720  Hardware Bag, Swing Beam

 

1  50400-721  Hardware Bag, 7 Ft. Swing Beam

IMPORTANT: When installing a Swing Beam to a Norfolk or Man-

chester Gym, do not install the two swing hangers closest to the 

gym. The area must be kept clear for tire swing clearance.

Содержание Premium Pine

Страница 1: ...4 2 Swings 1 Trapeze Parts for the optional Glider 50545 555 Glider Bracket Pack AA911 342 Chained Glider A 1 40587 102 4 Position Swing Beam Assembly OR 1 40586 102 3 Position Swing Beam Assembly B 1...

Страница 2: ...400 Beam Bracket 3 15144 950 Plug 50 Mm Square Black 1 50299 700 Bag HD Ny Glide Swing Hangers 6 50299 700 Bag HD Ny Glide Swing Hangers 6 6 14090 100 Heavy Duty Ny Glide Swing Hanger 12 17036 1403 L...

Страница 3: ...Mount to the Wall Support and Platform Side using two 5 16 x 4 Hex Bolt Assemblies Note It is best to mount the Swing Beam at the middle of the side of a gym Since the side of a Lexington gym is very...

Страница 4: ...ly Insert three T Bracket Plugs into the open ends of the T Bracket Fasten two Beam Brackets the T Bracket E using one 3 8 x 3 Hex Bolt two 3 8 Flat Washers and one 3 8 Nylock Nut each H D Ny Glide Sw...

Страница 5: ...he Swing Beam as shown In order to assure that the Hex Bolts fully engage with the Weld Nut the Hex Bolts used in this step are slightly longer than necessary Please use additional Flat Washers if the...

Страница 6: ...Leg Brace C to the Leg Assemblies Make sure the Leg Brace is level At the contact point mark the placement of the holes of the Leg Brace to the Leg Assemblies Drill a 1 4 diameter hole and 1 deep on...

Страница 7: ...this step are slightly longer than necessary Please use additional Flat Washers if the end of the Hex Bolt extends more than 1 8 beyond the Weld Nut STEP 11 Hole Caps Make sure that all hardware is s...

Страница 8: ...ranty claim Your Swing Beam comes with a nameplate It is important to fasten the nameplate to the gym Use the spacing of the swings to determine placement Fit the nameplate at the center of the swing...

Отзывы: