background image

© Copyright 2018, Creative Playthings

LEXINGTON PREMIUM PACK 16
LEXI9WPP16-100 Rev A (04-18)

Page 2

•  Once the roof, roof supports, ridge cap and swing beam 

are installed, proceed with the Skybox tower.

• Skybox step 2. Use the method found at the bottom of 

page 19 of the Skybox instructions to alter the Lexington 

sandbox end and Skybox sandbox sides. Mount them to 

the posts.

•  Skybox step 11. Use the front posts from The Skybox Roof 

(SJ926-810) in place of the post extensions.

•  Skybox Step 17. Wait to install the wall slats on the end 

where the Spiral Slide will mount, and the side where the 

Pinnacle climber will mount until after installing the spiral 

and climber.

•  Install the Skybox Wood Roof (SJ926-810).

•  Install the Play Floor (SC910-800Q).

•  Install the Play Walls (SC909-800Q) on the front, back and 

swing end of the main tower. 

•  Install the Gable Fans (SM964-402).

• Using a ladder, install the Dormers (SM963-402) in the 

positions shown on the front page of this guide. Ladder 

access will be obstructed by later installations.

• Install the Spiral Slide (8400-202) using instructions in-

cluded in 

63033-102.

 

•  Mount the Pinnacle Climber to the front of the Skybox in 

the position shown.

•  Assemble the Rock Climber (AH201-102Q).

• Lean the Access Ladder and Rock Climber as shown 

above. Check spacing.

• Secure the access ladder using the method shown in 

step 17 of the Lexington instructions. Complete the Rock 

Climber installation as instructed in the rock climber man-

ual.

• Fasten Access Ladder Handles (AG942-400) to the Ac-

cess Ladder.

•   Assemble the Chain Climber (SH089-917).

•  Set the Chain Climber and Super Wave Slide (15166-400) 

in place as shown on the front page of this guide. Check 

spacing.

•   Finish securing the Chain Climber.

•  Install the slide mount and slide using the method shown 

in steps 23 and 24 of the Lexington instructions.

• Install wall slats in the postions shown in images, using 

the methods from the Lexington and Skybox instructions. 

Gaps must be narrower than 3-1/2" or wider than 9" to 

prevent potential head entrapment.

• Mount one hand grip to the entrance wall slat between 

the ladder and the rock climber on the back of the gym. 

Mount the other hand grip to the adjacent post at the same 

height, using 1/4 x 1-1/2" lag screws and 1/4" flat washers. 

Drill 3/16" diameter pilot holes for the lag screws.

• Double-check all fasteners are secure and all recessed 

hardware is covered by hole caps.

Swing Beam

Spiral Slide

Gable Fan

Rock Climber

Play Walls 

Chain Climber

Pinnacle Climber

Отзывы: