background image

LEXINGTON PREMIUM PACK 16

LEXI9WPP16-100 Rev A (04-18)

© Copyright 2018, Creative Playthings

CHILDHOOD  STARTS  HERE

LEXI9WPP16

Lexington Premium Pack 16

• Start by assembling the Lexington tower. Instructions and hard-

ware are in the cartons noted at left.

 The gym is rotated 90° from 

the position shown in the instructions.

The components of this gym can be combined with others to 

create different play sets. This is the best order of assembly 

to create this specific set.

Read this sheet and all instructions included with the 

different parts before assembly.

See the Instructions and Owner's Manual included in carton 

63007-445 for important safety information.

Dimensions of assembled package:

27' 9" wide x 15' 7" deep x 12' 9" tall

Cartons for this Play Set:

1  63007-421 

Lexington Gym 1 (Hardware)

1  63007-422 

Lexington Gym 2

1  63007-423 

Lexington Gym 3

1  63007-445 

Lexington Roof (Hdwre & Instr)

1  SH946-102  Access Ladder, 5ft

1  AG942-400  Access Ladder Handles (Hdwre & Instr)

1  63058-202 

4 Position Swing Beam

1  63060-222 

9ft Swing Beam Legs (Hdwre & Instr)

1  50546-777 

3 Swings, 1 Trapeze

1  15166-400 

10 ft. Super Wave Slide

1  SM964-402  Gable Fans (Hdwre & Instr)

1  SM963-402  Dormer (Hdwre & Instr)

1  AH201-102Q  Rock Climbing Wall (Hdwre & Instr)

1  63090-222 

Chain Climber Frame

1  63089-606 

Chain Cargo Net

1  SC909-800Q  Lexington Play Walls

1  SC910-800Q  Lexington Play Floor

1  63008-221 

Skybox 1 (Hdwre & Instr)

1  63008-222 

Skybox 2

1  SJ926-810  Skybox Wood Roof (Hdwre & Instr)

1  8400-202 

Spiral Slide, Green (Hardware)

1  63033-102 

Spiral Mount (Hdwre & Instr)

1  AG943-400  Slide Handle (Hdwre & Instr)

1  SH304-101Q  Pinnacle Rock Wall (Hdwre & Instr)

15 1/2"

7 1/4"

3"

0"

• Wait to install the Access Ladder, Slide, and 

Wall Slats until after the rest of the play set is 

complete.

•  Lex step 2. Omit the sandbox end from the end 

of the gym adjacent to the Skybox. It will be 

altered to fit the Skybox.

•  Lex step 7. Do not install the safety rail.

•  Lex step 14. Do not install the end wall support 

on the Skybox end of the tower.

•  Lex step 15. The swing mount isn't needed.

•  Lex step 25. Before installing the roof, find the 

post where the swing beam will mount. Drill 

7/16" diameter holes through the post at 3", 

7-1/4" and 15-1/2" below the top of the post as 

shown at right.The beam will be mounted to the 

Dormers

front of the post using these holes. Insert one 5/16" weld nut into 

the top hole on the inside face of the post. Be sure the threads on 

the weld nut are clear, it will be captured by the roof support. Install 

the roof.

• Mount the Swing Beam using instructions and hardware includ-

ed in 63060-222. Mount the beam to the previously drilled holes 

shown above right rather than the way shown in the instructions. 

You may need to temporarily disconnect the roof from the post to 

put the beam in place.

Отзывы: