Assembly
CLARKDALE
19966-100 Rev A (04-20)
© Copyright 2018, Creative Playthings
Page 3
ASSEMBLY INSTRUCTIONS
CLRKCP2 — Clarkdale 2
Cartons for this Play Set:
1 63098-111
Clarkdale Box 1
1 63083-352
Clayton Box 2
1 63083-353
Clayton Tent (Hdwre & Inst.)
1 8364-400
Scoop Slide 10ft.
1 63061-202
Swing Beam - 3 Pos Premium
1 63059-212
Beam Legs 7ft. (Hdwre & Inst.)
1 31820-102
Swing Mount
1 SH946-102 Access Ladder 5ft. - Premium
1 AA934-204 2 Swings, 1 Ring Trapeze
1 63082-102
Monkey Bar (Hdwre & Inst.)
Dimensions of assembled package:
17' 6" wide x 15' 3" deep x 10' 5" tall
• The instructions found in 63083-353 give a complete description for
assembling the play tower with the following exceptions:
• On step 11, the Swing Mount provided is different than the Swing
Mount shown in the manual. The counter-bored holes in the Swing
Mount should face the gym. Secure the bottom of the Swing Mount
using the 5/16 x 4-1/2" Hex Bolt Assembly provided. The top hole will
not align with the existing hole. Use a 3/8" diameter drill to make a hole
through the top support and secure using one 5/16 x 4-1/2" Hex Bolt
Assembly. (See illustration at right).
• Steps 20 & 21: Use the pre-assembled Access Ladder with plastic
steps. Mount the access ladder to the back of the tower.
• Step 24. Wait to install the wall slats until after installing the monkey
bar.
• Mount the Monkey Bar (63082-102) to the front of the tower in the posi-
tion shown above.
• Proceed with assembly. On step 26 use the Deluxe Hand Grips. Hand
grips should mount on the back of the set next to the Access Ladder.
• Please note the Clarkdale comes with a Scoop Slide rather than the
slide shown in step 27. Installation is the same.
• Assemble the Swing Beam as shown in the instructions in 63059-212
and mount it to the tower.
• After installing the beam and securing the ground stakes, check to as-
sure all fasteners are secure.
• Hang the swings and trapeze.