pg 22 of 48
REF: VOY122 - QUARTER MASTER
SECTION 2 - ENTRY
Position the ENTRY PANELS - Starboard / Portside
DRY INSTALL - Do not concrete posts until the full assembly is complete
Attach the Starboard ENTRY PANEL to the BOW
Using 2 x FM80 WOOD SCREWS
1
2
Ensure
The PANELS are positioned 30mm above
FINISHED GROUND LEVEL
Installation Instructions
FGL