L1
L2
CB
M
START
CAP.
T1
T2
RUN CAP.
1
2
5
C
OL
G
G
R
E
E
N
B
L
A
C
K
R
E
D
W
H
I
T
E
T1
T2
T3
R
S
C
G
R
E
E
N
G
OL
T1
T2 T3
W
H
I
T
E
R
E
D
B
L
A
C
K
M
CB
L1
L3
L2
PUMP
200/230 VOLT
1 PHASE
60 HZ.
200-230/460 VOLT
3 PHASE
60 HZ.
EXTERNAL WIRING
D-4.4) Cable Assembly:
Remove gland nuts (15b) & (16b), friction rings (15c) & (16c) and grommets (15d) & (16d) from motor housing (10) on
2HP and from cover plate (13) on 3,5,7.5HP, inspect and replace if required. See Fig. 9.
Power Cable-
To reassemble, insert one friction ring (15c), grommet (15d), one friction ring (15c) and gland nut (15b)
into cover plate (13).
Control Cable-
to reassemble, insert one friction ring (16c), grommet (16d), one friction ring (16c) and gland nut (16b)
into motor housing (10) on 2HP or cover plate (13) on 3,5,7.5HP. Torque gland nuts (15b) and (16b) to 15 ft. lbs. to
prevent water leakage.
15
Содержание SGV2002L
Страница 18: ...Fig 10 2HP SGV SERIES 18 ...
Страница 19: ...2HP SGV SERIES Fig 11 19 ...
Страница 24: ...3 5 7 5HP SGV SERIES Fig 13 24 ...
Страница 32: ...NOTES 32 ...