D-3) Start-Up Report:

Included at the end of this manual is a start-up report sheet, 
this sheet is to be completed as applicable. Return one copy 
to Barnes and store the second in the control panel or with 
the pump manual if no control panel is used. It is important to 
record this data at initial start-up since it will be useful to refer 
to should servicing the pump be required in the future.

D-3.1) Identifi cation Plate:

Record the numbers from the pump identifi cation plate on 
both START-UP REPORTS provided at the end of the manual 
for future reference.

D-3.2) Insulation Test:

Before the pump is put into service, an insulation (megger) 
test should be performed on the motor. The resistance values 
(ohms) as well as the voltage (volts) and current (amps) 
should be recorded on the start-up report.

D-3.3) Pump-Down Test

:

After the pump has been properly wired and lowered into the 
basin, sump or lift station, it is advisable to check the system 
by fi lling with liquid and allowing the pump to operate through 
its pumping cycle. The time needed to empty the system, or 
pump-down time along with the volume of water, should be 
recorded on the start-up report.

SECTION E: PREVENTATIVE MAINTENANCE

As the motor is oil fi lled, no lubrication or other maintenance 
is required, and generally Crane Pumps & Systems will give 
very reliable service and can be expected to operate for years 
on normal sewage pumping without failing. However as with 
any mechanical piece of equipment a preventive mainte-
nance program is recommended and suggested to include 
the following checks:

1) 

Inspect motor and seal chambers for oil level and

 

contamination and repair as required per section F-1.

2) 

Inspect impeller and body for excessive build-up or

 

clogging and repair as required per section F-2.

3) 

Inspect motor and bearings and replace as required per

 section 

F-3.

4) 

Inspect seal and diaphragm for wear or leakage and

 

repair as required per section F-4.

SECTION F: SERVICE AND REPAIR

NOTE:

 All item numbers in ( ) refer to Figures 10 & 11.

F-1) Lubrication:

Anytime the pump is removed from operation the cooling oil 
in the motor housing (2) and seal chamber, must be checked 
visually for oil level and contamination.

F-1.1) Checking Oil:
Motor Housing -

 To check oil, set unit upright. Remove cap 

screws (6), lift conduit box assembly (10) from motor housing 
(2) but 

DO NOT

 disconnect conduit box wiring from motor 

leads. With a fl ashlight, visually inspect the oil in the motor 
housing (2) to make sure it is clean, clear and that oil level is 
above all internal componentry.

Seal Chamber -

 Place pump on its side with pipe plug (22) 

downward, remove pipe plug (22) and drain oil from the seal 
chamber. If the oil is found to contain considerable water 
or other contamination or little oil drains out, the shaft seal 
(46) and diaphragm (32) should be inspected and replaced if 
required.

F-1.2) Testing Oil:

1. 

Place pump on it’s side, remove cap screws (6), lift

 

conduit box assembly (10) from motor housing (2) and

 

drain oil into a clean, dry container. In separate container 

 

drain seal chamber by removing pipe plug (22).

2. 

Check oil for contamination using an oil tester with a

 

range to 30 Kilovolts breakdown.

3. 

If oil is found to be clean and uncontaminated (measure

 

above 15 KV. breakdown), refi ll the motor housing and

 

seal chamber as per section F-1.3.

4. 

If oil is found to be dirty or contaminated (or measures

 

below 15 KV. breakdown), the the pump must be 

 

carefully inspected for leaks at the shaft seal (46), 

 

conduit box assembly (10), diaphragm (32), O-ring (42),

 

pipe plug (22) and pressure valve (5) before refi lling with

 

oil. To locate the leak, perform a pressure test as per 

 

section F-1.4. After leak is repaired, refi ll with new oil as

 per 

section 

F-1.3.

F-1.3) Replacing Oil:
Motor Housing -

 Drain all oil from motor housing and dis-

pose of properly. Refi ll with (see parts list for amount) new 
cooling oil as per Table 1. An air space must remain in the top 
of the motor housing to compensate for oil expansion (see 
Fig. 10 or 12). Set unit upright and fi ll only until the motor, as 
viewed through the conduit box opening, is just covered and 
no more. Reassemble the O-ring (11), conduit box assembly 
(10) and cap screws (6), apply thread locking compound 
to each cap screw (6) thread before installing. Torque cap 
screws (6) to 15 ft., lb.

Seal Chamber -

 Refi ll chamber completely full with new 

cooling oil per Table 1 or reuse the uncontaminated oil. (See 
parts list for amount.)

Important! - Do not overfi ll oil! Overfi lling 
of motor housing with oil can create 
excessive and dangerous hydraulic 
pressure which can destroy the pump 

and create a hazard. Overfi lling oil voids 
warranty.

TABLE 1 - COOLING OIL - Dielectric

SUPPLIER

GRADE

BP

Enerpar SE100

Conoco

Pale Paraffi n 22

Mobile

D.T.E. Oil Light

G & G Oil

Circulating 22

Imperial Oil

Voltesso-35

Shell Canada

Transformer-10

Texaco

Diala-Oil-AX

Woco

Premium 100

Содержание PROSSER 4SED-L Series

Страница 1: ...ct improvement program product changes may occur As such Crane Pumps Systems reserves the right to change product without prior written notification 420 Third Street 83 West Drive Bramton Piqua Ohio 45356 Ontario Canada L6T 2J6 Phone 937 778 8947 Phone 905 457 6223 Fax 937 773 7157 Fax 905 457 2650 www cranepumps com Form No 097251 Rev G Series 4SED L 3 10HP 1750RPM DISCONTINUED Parts may NOT be a...

Страница 2: ...0 14 EXPLODED VIEW Fig 11 15 PARTS LIST 16 17 RETURNED GOODS POLICY 19 WARRANT START UP REPORT WARRANTY REGISTRATION SPECIAL TOOLS AND EQUIPMENT INSULATION TESTER MEGGER DIELECTRIC TESTER SEAL TOOL KIT see parts list PRESSURE GAUGE KIT see parts list Other brand and product names are trademarks or registered trademarks of their respective holders PROSSER is a registered trademark of Crane Pumps Sy...

Страница 3: ...ert fingers in pump with power connected Always wear eye protection when working on pumps Make sure lifting handles are securely fastened each time before lifting DO NOT operate pump without safety devices in place Always replace safety devices that have been removed during service or repair Secure the pump in its operating position so it can not tip over fall or slide DO NOT exceed manufacturers ...

Страница 4: ...una N Hardware 300 series stainless steel CORD ENTRY 50 Ft 15 2m Cord Epoxy sealed housing with secondary pressure grommet for sealing and strain relief SPEED 1750RPM 60Hz nominal UPPER BEARING Design Single Row Ball Oil Lubricated Load Radial LOWER BEARING Design Double Row Ball Oil Lubricated Load Radial Thrust MOTOR Design NEMA L Single phase NEMA B Three Phase Torque Curve Oil Filled Squirrel ...

Страница 5: ... Department in Piqua Ohio telephone 937 778 8947 or Crane Pumps Systems Canada in Brampton Ontario 905 457 6223 SECTION C INSTALLATION C 1 Location Water feeding and discharging for construction and civil works Water supply and sewage works Various kinds of industrial facilities Housing and building facilities The pump can be used at almost all places but avoid con tinuous short water operation at...

Страница 6: ...ATINGS Volts Continuous Amperes Inrush Amperes 110 120 3 00 30 0 220 240 1 50 15 0 440 480 0 75 7 5 600 0 60 6 0 C 3 4 Wire Size Consult a qualified electrician for proper wire size if additional power cable is required See table for electrical information SECTION D START UP OPERATION D 1 Check Voltage and Phase Before operating pump compare the voltage and phase information stamped on the pump id...

Страница 7: ...otor housing 2 but DO NOT disconnect conduit box wiring from motor leads With a flashlight visually inspect the oil in the motor housing 2 to make sure it is clean clear and that oil level is above all internal componentry Seal Chamber Place pump on its side with pipe plug 22 downward remove pipe plug 22 and drain oil from the seal chamber If the oil is found to contain considerable water or other...

Страница 8: ...t lb Check for free rotation of motor and impeller F 3 Motor and Bearing Service F 3 1 Disassembly and Inspection To examine or replace the motor 1 and bearings 3 and 47 disassemble pump volute and impeller as outlined in paragraph F 2 1 and disassemble seal plate and shaft seal as outlined in paragraph F 4 1 Drain oil from motor as out lined in paragraph F 1 3 Position unit upright using blocks t...

Страница 9: ...hes If the end play is within these tolerances proceed with reassembly If the end play is not within the above listed tolerances the motor upper end bell must be disassembled and sufficient 010 shims 9 must be added or removed as required Reassemble and recheck again for the required listed end play tolerance F 4 Shaft Seal and Diaphragm Service Important Handle seal parts with extreme care do not...

Страница 10: ...nd not cocked or resting on bellows tail Re oil shaft and lightly oil in ner surface of outboard rotating member 46B With tail section toward bearing bracket 21 slide rotating member 46B onto shaft with seal pusher until retainer engag es spring 46C and spring is compressed slightly Make sure spring 46C is properly engaged in both retainers Slide seal plate 25 over shaft onto bearing bracket 21 be...

Страница 11: ... White 3 9 T4 T5 T6 Together THREE PHASE 480 600 VOLT AC THREE PHASE 480 600 VOLT AC Power Cable Power Cable Motor Lead Number Motor Lead Number Green Ground Green Black 1 Red 2 White 3 T4 T7 Together T5 T8 Together T6 T9 Together MOISTURE AND TEMPERATURE SENSORS MOISTURE AND TEMPERATURE SENSORS Control Cable Control Cable Lead Number Lead Number Green Ground Green Black P1 Temperature Sensor Whit...

Страница 12: ...e design configuration This number is used for ordering and obtaining information G 3 MODEL NUMBER This designation consists of numbers and letters which repre sent the discharge size series horsepower motor phase and voltage speed and pump design This number is used for order ing and obtaining information G 4 SERIAL NUMBER The serial number block will consist of a six digit number which is specif...

Страница 13: ...eller for freedom of operation security and condition Clean impeller and inlet of any obstruction 9 Loosen union slightly to allow trapped air to escape Verify that turn off level of switch is set so that the suction is always flooded Clean vent hole 10 Check rotation If power supply is three phase reverse any two of three power supply leads to ensure proper impeller rotation 11 Repair fixtures as...

Страница 14: ...14 FIGURE 10 ...

Страница 15: ...15 FIGURE 11 ...

Страница 16: ...n Ring 2 071431A Friction Ring For 5HP 1PH 10HP ONLY 10d 1 051452 Grommet 1 071430A Grommet For 5HP 1PH 10HP ONLY 10e 1 Control Cable Not Sold Separately 10f 1 051448 Gland Nut 10g 2 021531 Friction Ring 10h 1 066871 Grommet 10J 1 030169 Ground Screw 10 32 x 5 8 Lg Stainless 11 1 051937 Square Ring 12 5 016406 Connector 5 030148 Connector For 5HP 1PH 10HP ONLY 13 2 5 Gal 029034 Oil Motor Housing 3...

Страница 17: ... 001162 Shim 031 x 2 O D Bearing 32 1 022873 Diaphragm 33 1 051467 Shaft Key 1 4 Sq x 1 1 4 lg Stainless 34 1 037116 Cap Screw 1 2 13 x 1 1 4 lg w nyloc stainless 35 1 070089 Washer 562 ID x 1 625 OD x 187 THK Stainless 36 2 001348 Shim 031 x 1 5 O D Impeller 37 2 001349 Shim 010 x 1 5 O D Impeller 39 2 036803 Soc Hd Cap Screw 1 4 20 x 3 4 lg Stainless 41 1 036852 Gasket 42 1 056668 Square Ring 43...

Страница 18: ...rformance specifications must be in writing and such writing must be signed by our authorized representative Due to inaccuracies in field testing if a conflict arises between the results of field testing conducted by or for user and laboratory tests corrected for field performance the latter shall control RECOMMENDATIONS FOR SPECIAL APPLICATIONS OR THOSE RESULTING FROM SYSTEMS ANALYSES AND EVALUAT...

Страница 19: ...ent To Insure That Employees Will Not Be Exposed To Health Hazards In Handling Said Material All Applicable Laws And Regulations Shall Apply IMPORTANT WARRANTY REGISTRATION Your product is covered by the enclosed Warranty To complete the Warranty Registration Form go to http www cranepumps com ProductRegistration If you have a claim under the provision of the warranty contact your local Crane Pump...

Страница 20: ...Does impeller turn freely by hand Yes No Condition of equipment Good Fair Poor Condition of cable jacket Good Fair Poor Resistance of cable jacket Good Fair Poor Resistance of cable and pump motor measured at pump control Red Black Ohms Red White Ohms White Black Ohms Resistance of Ground Circuit between Control Panel and outside of pump Ohms MEG Ohms check of insulation Red to Ground White to Gro...

Страница 21: ...tion Pump Off L1 L2 L2 L3 L3 L1 Voltage supply at panel line connection Pump On L1 L2 L2 L3 L3 L1 Amperage Load connection Pump On L1 L2 L3 FINAL CHECK Is pump seated on discharge properly Check for leaks Does check valve s operate properly Flow Does station appear to operate at proper rate Pump down time Noise level High Medium Low Comments Equipment difficulties during start up MANUALS Has opera...

Страница 22: ...22 Notes ...