16
FIGURE 6
STEPS & TIPS:
• Disconnect all power supplied to panel prior to servicing.
• Remove existing circuit breaker from control panel if rating is less than 20 AMPS.
• Install new circuit breaker to control panel (2 Pole 20 AMP) (Ordered Separately).
• Rewire existing power supplied to control panel if required.
WIRE FEEDING THE PANEL NEEDS TO BE AT LEAST 12 GAUGE. (MAY NEED TO BE
LARGER DEPENDING UPON LENGTH OF RUN. CONSULT QUALIFIED ELECTRICIAN FOR
PROPER APPLICATION.
Optional Cicuit Breakers - Ordered Separately
PART NO.
DESCRIPTION
113291B
20 AMP, GE THQP Snap in Breaker
105476
20 AMP, DIN Rail Breaker
®
Содержание BARNES RAZOR ZOGP Series
Страница 10: ...10 Single phase 240 Volt AC 60Hz AUE CC CE CO CT Series 12 5 SOW FIGURE 7 Wiring Harness Item 54 on Figure 8 ...
Страница 12: ...12 FIGURE 8 3 1 2 4 5 6 7 8 9 10 11 9 13 12 14 15 9 16 Torque all 1 4 20 bolts to 79 in lb ...
Страница 15: ...15 Typical Wiring Diagram Generic PUMP ...
Страница 18: ...18 FIGURE 8 2000 SERIES STATION WIRING WIRING FOR UNITS NOT SUPPLIED WITH FACTORY WIRED EQD ...