9
J.V. MANUFACTURING, INC
SC-T1-HTG and SC-T2-HTG SPECIFICATIONS
General Equipment Specifications
SC-T1
SC-T2
Wastec Charge Box Rating
.86 cu/yd
1.45 cu/yd
Clear Top Opening
31”x48”
41”x58”
Cycle Time (sec)
28
42
System Pressure (psi)
Normal
2,000
2,000
Maximum
2,400
2,400
Compaction Force (lbs)
Normal
40,600
40,600
Maximum
48,800
48,800
Ram Face Pressure (psi)
Normal
36.7
23.3
Maximum
44.2
28.0
Ram Penetration
6”
8”
Motor (hp)
10
10
Motor (voltage)
208/230/480 3ph
208/230/480 3ph
Pump (capacity) (gpm)
10.5
10.5
Reservoir capacity (gal)
22
22
Cylinder
Bore
4” (2)
4” (2)
Stroke
26”
34”
Rod
2”
2”
Construction
Floor
1/2” steel plate
1/2” steel plate
4” “C” Channel
1/4” steel truss type structure
Sides
3/16” steel plate
3/16” steel plate
2”x6”x3/16” steel tube
4” “C” Channel
4” “C” Channel
Breaker Bar
6”x6”x1” steel angle
6”x6”x1” steel angle
Ram
Top
3/16” steel plate
3/16” steel plate
Sides
3/16” steel plate
1/4” steel plate
Bottom
1/2” AR steel plate
1/2” AR steel plate
Face
1/2” steel plate
1/2” steel plate
Guides
UHMW pads
UHMW pads
Содержание SC-02
Страница 2: ...2 ...
Страница 4: ...4 ...
Страница 10: ...10 ...
Страница 11: ...11 Operation Section ...
Страница 12: ...12 SAFETY DECALS ...
Страница 13: ...13 SAFETY DECAL PLACEMENT ...
Страница 21: ...21 Authorized Technician Maintenance Section ...
Страница 26: ...26 Authorized Technician Maintenance cont Electrical Schematic ...
Страница 27: ...27 Authorized Technician Maintenance cont Hydraulic Schematic ...
Страница 28: ...28 Authorized Technician Maintenance cont Hydraulic Schematic ...
Страница 30: ...30 Parts Section ...
Страница 33: ...33 Parts Section ...
Страница 34: ...34 Installation Section ...
Страница 37: ...37 Hauler Section ...
Страница 39: ...39 Warranty Policy And Procedure Section ...