Revised: March-11-16
3
Installation
1.
Ensure the Installation location is level and clean
2.
Install the Top Track to the Header -
Part: A
ü
Fasten the top track to the header using screws that best fit the application
ü
Note: Pre-drill the top track before fastening the top track to the header
ü
Note: Make sure the top track is positioned where you would like your retractable screen to operate - plumb
the top track with the bottom surface where your bottom guide will be positioned
3.
Dual Central Screen Configurations
ONLY
-
Parts: J and K
ü
If you have ordered a dual-central screen configuration, you will be required to install a dual-central stop in
the center of the top track
ü
Find the center of the top track and mark it with a pencil
ü
Fasten the D/C stop to the top track with the provided TEK screws -
Part: K
ü
Note: Use the centerline in the top track as a guide when installing the D/C stop
4.
Install the Jamb Profile -
Part: B
ü
Find the center of the top track by measuring 7/8” (23mm) from either side of top track
ü
Use a straight edge or a laser to inscribe a line down the vertical surface
ü
Peel the backing off of the anchor plates for temporary positioning
ü
Align the center of the anchor plates with the inscribed line
ü
Note: Ensure that the anchor plates are evenly spaced
ü
Fasten the anchor plates to the inside surface with fasteners that best fit the application
ü
Jamb Lock Option: Insert jamb lock into the jamb profile by sliding the metal plate on the rear of the jamb
lock into the center groove on the jamb profile -
Part: L
ü
Insert the top of the jamb profile into the top track and then push the jamb profile into the anchor plates
ü
Note: The jamb can be fastened to either vertical inside surface depending on which direction you want the
screen to operate
- Left to Right: Install jamb profile on right side
- Right to Left: Install jamb profile on left side
ü
Note: The jamb profile can be directly fastened to the inside surface with fasteners if required
5.
Install the Base Jamb Mount -
Part: D
ü
Install the base-jamb mount on the vertical surface opposite of the jamb profile that was installed in Step #4
ü
Pre-drill the base-jamb mount every 2 feet (610mm)
ü
The top of the base-jamb mount inside the top track and align the bottom of the jamb mount so that it’s level
and square
ü
Fasten the base-jamb mount to the vertical surface with fasteners that best fit the application