Crafco 56900 Скачать руководство пользователя страница 12

 

 

1

 

2

 

 

3

 

I
B
d

 

 

 

5

 

 

 

1. Start 

e

positio
start. 
throttl
valve 

2. Set 

te

525°

3. Turn 

f the burne

Burner Pow
determine c

4. 

Allow
heat.
mate
switc
proce
perso

Enga
rotat
simu
spee
(see 
time.
lbs. 

5. Tem

patch
off as
heat 
by m

Rem

CAU

hand

engine. To 

on. Warning

Release ke
e lever to s

switch is in

emperature

F. and mate

Burner Pow

r does not 

wer Switch b

cause of ma

w the heatin

. Start the m

erial into the

ches), add m

edure will p
onnel. 

age the mix

ion. When 

ultaneously.

ed of mixing

Fig. 8). Th

. The minim

perature re

hing materi

s desired.  

with a han

moving hand

move excess

UTION: 

Be s

dle with safe

MA

start engin

g lights sho

ey when en

set engine a
n the neutra

e dials to de

erial 410°F.

wer Switch “

ignite the fi

back “ON.” 
alfunction (s

ng oil to con

mixer as so
e mixer tank

material an

prevent the 

xer by movi

changing th

 If mixer ja

g is controlle

e valves sh

mum amoun

eadout on b

al reaches 
To help spe

d torch to h

dle down. D

s patching m

sure discha
ety chain if 

12

ACHINE

e, insert ke

ould turn “O

ngine is runn

at desired s

al position.

esired tempe

(see Fig. 6

“ON” (see F

CA

rst time, tu

Burner sho

see Trouble

ntinue to he

oon as poss

k, the mixe

d close the

hot materia

ng the Mixe

he speed o

ms, switch 
ed by the p

hould be mo

nt of materia

urner contr

correct app

eed up pou

help heat th

Drain mater

material fro

arge gate is

machine is

 

E STAR

ey into the c

ON.” Turn ke

ning. Leave

speed (see 

erature. Ho

6). 

Fig. 6). 

AUTION 

rn Burner P

ould ignite. 

e Shooting 

eat. Place b
sible to brea

r will stop w

e lid again to

al from spla

er Control S

f mixing, m

may be mo

position of th

oved togeth

al needed f

rol box indic

plication tem

ur time, you

he discharg

ial into pou

om chute wi

s completely

s transporte

RT UP

 

control pan

ey to secon

e at idle for 

Fig. 5). Ma

ot oil temper

 

Power Switc

If burner st

Guide, pag

bags of mat

ak up the b

when lifting 

o start the m

ashing and 

Switch to fo

move both b

oved for op

he 2 bypas

her (either i

for proper m

cates mate
mperature, 

u can open 

e pipe. Disc

r bucket. 

ith scraping

y closed aft

ed (see Fig.

el. Turn key

nd position.

r a few minu
ake sure hy

rature shou

ch “OFF.” T

till does not

ge 25). 

terial in the 

ags. When

the lid (if e

mixer. Follo

causing se

orward or re

ypass hydr
posite rotat

ss hydraulic

in or out) no

mixer opera

rial temper

material m

the Gate S

charge Gat

g tool. 

fter each dr

. 2). 

y to first 

 Engine sh

utes. Move 

ydraulic con

uld not exce

Then turn 

t ignite, 

mixer and 

 loading so

equipped wi

owing this 

erious burns

everse 

raulic valve

tion. The 

c valves 

ot one at a 

ation is 400

ature. Whe

may be draw

ide Door an

te is opene

raw off. Loc

ould 

ntrol 

ed 

olid 

ith lid 

s to 

en 
wn 

nd 

ck 

Содержание 56900

Страница 1: ...OP PERA MO ATING ODEL G AND PAT PART MA 1 D SER TCHER ANUAL 56 Rev A RVICE R I DI 6933 E MAN IESEL NUAL L L...

Страница 2: ...Hose S N _____________________________________ 1st Pump S N _____________________________________ 2nd Pump S N ____________________________________ Engine S N ______________________________________ Co...

Страница 3: ...P Part Nu Patch umber 5 3 her I Di 56900 esel Skid M Mount...

Страница 4: ...ervice Instructions 18 Maintenance Maintenance Instructions 19 Maintenance Chart 20 Recommended Fluids Lubricants 21 Heat Transfer Oil Typical Specifications 21 General Maintenance Items 22 Instructio...

Страница 5: ...o run the m ation sel is design ver as with a if ine as instru regularly as e engine exh te of Califor m Operate 5 cher I D RAFCO Pa ixer properl ned to give all specifica ucted in this s stated in th...

Страница 6: ...FETY PR product and hard hat if re ggles or face plying mater RNING sign any part of t s operating t e lied patchin ly before op th machine g or confine ior to refillin al tank stop ld splash an way...

Страница 7: ...eak proof best insuran uld not be le nd screws af mes no liabili Y PREC for starting a ow signs of ce against a eft unattende fter every 10 ity for an ac 7 CAUTIO and shut do wear frayin accidents ed...

Страница 8: ...8 Patche MITED W zed dealer examination anship The ngine or co y their manu rants structu licator valve Crafco In on abuse i ntrol extends onl vered above or conseque st incurred borne by th ws any o...

Страница 9: ...defined as but not limited to material pumps sealing tips tires etc Note All engine warranties are covered through the engine manufacturer If you need information for a distributor in your area pleas...

Страница 10: ...ature Control Automatic Digital readout Hot oil and material Auto flame shutdown Engine Kohler Single Cylinder Max Output Model KD420 Diesel Fueled 9 1HP Drive Mechanism All hydraulic with two speed f...

Страница 11: ...of filler tube 3 Check heat transfer oil level see Fig 4 At 70 F the oil should touch the dipstick DO NOT overfill or spillage may occur when oil is heated and expands NEVER REMOVE DIPSTICK WHEN OIL I...

Страница 12: ...be mo nt of materia urner contr correct app eed up pou help heat th Drain mater material fro arge gate is machine is E STAR ey into the c ON Turn ke ning Leave speed see erature Ho 6 Fig 6 AUTION rn...

Страница 13: ...Discharge Gate G Gate Side Doo or 13 3 Fig 1 Fig 2 Sa Gr afety Chain rease Fitting...

Страница 14: ...1 F F 14 Fig 3 Fig 4 Mixer Co Heat Tran Dips ontrol Switch nsfer Oil stick...

Страница 15: ...T Bu Co Temperature urner Power S ontrol Panel Dials Switch F 15 Fig 5 Fig 6 Thro Engine C Ignit ottle Lever Control Panel tion Key...

Страница 16: ...Hydraulic Ta ank Diesel Fue F F el Tank 16 Fig 7 Fig 8 Hyd By draulic Fill C y pass Valve Cap es Diesel Fill Cap...

Страница 17: ...1 We highly recommend emptying all if not most of the material before shutting down the machine It will result in faster start up times in the morning help keep the aggregate from settling at the bott...

Страница 18: ...k e items king on mix riodically C tenance Pr 18 HOOTIN USE low at one time w pressure allized materia k ure ystallized d off e NSTRU achine at le djustments k for emerg xer if neces Check with rocedu...

Страница 19: ...CONTROL rol knob cal e calibratio TENAN e engine pe ditional ope aily Chang 00 hours of EALS t at 40 hour a good gra hould touch CALIBRAT ibration we on line on th 19 CE INS er the Kohle erating and...

Страница 20: ...Weekly Mixer shaft Packing Tighten when hot at 40 hour intervals Do not over tighten Heat Transfer Oil Check every 8 hours Change After 500 hours or 1 year Hydraulic Oil Return Line Filter Change at 2...

Страница 21: ...transf RER CAL 68 445 F 325 50 WA e is a grade grade of oil n warranties es deteriora ave determ and replace ver occurs fi LUIDS OMMENDE owner s man e ulic 46 8 Group II RANSFE fer oils to b PR Heat T...

Страница 22: ...ne Mounted Fuel Filter 56947 INSTRUCTIONS FOR ORDERING PARTS Parts may be ordered from your local CRAFCO distributor or directly from CRAFCO Inc if a distributor is not available in your area When ord...

Страница 23: ...to be cut out Make sure you cut out enough of the pavement to remove all cracking around the patch area If the repair area extends to both sides of a joint the repair area must be a minimum of 4 on ea...

Страница 24: ...y within 15 20 minutes Flash surface with hand torch to pop bubbles 6 Apply the next level and float surface of the material with the hot irons Seal the edges of the repair by pulling liquid to the ed...

Страница 25: ...ing at attery 25 ROUBLE volts at PO FF use rminal 4 o k Stat ensor for 12 volts d Pak Stat ulty sensor heck for 12 O Bad sole Bad conn Faulty cir Broken o S Faulty D Faulty or Faulty ign ceramic Incor...

Страница 26: ...F U DI Air Shutter Air Band 0 uel Pressu se fuel and ESEL B 7 0 ure 140 PS d hydraulic BURNE DIESE SI c pressure 26 ER ELEC EL BUR gauge kit p CTROD NER SE part numbe DE ADJ ETTING er 29627 USTME GS E...

Страница 27: ...443 8 1445 9 1448 0 1450 1 1452 2 1454 3 1456 4 1458 5 1460 6 1462 7 250 1464 8 1466 9 1469 0 1471 1 1473 2 1475 3 1477 3 1479 4 1481 5 1483 6 260 1485 7 1487 8 1489 9 1492 0 1494 1 1496 1 1498 2 1500...

Страница 28: ...Patche 28 er I Dies sel...

Страница 29: ...209 1 3 4 90 DEG ELBOW 12 28239 2 3 4 ELBOW 13 56270 1 EXHAUST DUCT ASSEMBLY 14 56797 1 VENT COVER ASSY 15 56370 1 MODIFIED LID ASSEMBLY 16 56252 1 OVERFLOW TANK ASSEMBLY 17 56293 2 BEARING PILLOW BLO...

Страница 30: ...Patche 30 er I Dies sel...

Страница 31: ...OUPLING HALF GEAR BOX 37 56203 1 6 1 GEARBOX ASSEMBLY 38 56244 1 ADAPTER COUPLING GEAR BOX HYD 39 42574 1 MIXER MOTOR 40 28001 1 1 4 CLOSE NIPPLE 41 28176 2 1 4 COUPLING 42 46380 1 BURNER ASSEMBLY 43...

Страница 32: ...1 1 ENGINE KOHLER 9 1 HP NS 56715 1 CONTROL BOX ASSEMBLY NS 44829 1 COUPLING HALF 1 NS 44830 1 SPIDER FOR COUPLING NS 56303 1 COUPLING HALF NS 44806 1 ADAPTER PUMP MOUNT NS 43465 1 RTD SENSOR 18 STEM...

Страница 33: ...ELEC CTRICA Patch AL SCH 33 her I Die HEMATI esel C PART T 26566...

Страница 34: ...HY Patch YDRAU Kit Pa 34 her I Die LIC DIA art 265 esel AGRAM 565 M...

Страница 35: ...3 HYDRAULIC PUMP FRONT PORT TO SELECTOR VALVE 2 1 29828 90 O RING ADAPTER 1 6M3K 6G 6FJX 6G 6FJX90S 34 30 75 3 8 X 34 HYDRAULIC HOSE 1 29841 8 MP X 6 JIC STR ADAPTER 4 SELECTOR VALVE 2 TO OUTLET PORT...

Страница 36: ...5 8 O RING X 3 8 TUBE 90 ADAPTOR 1 6M3K 6G 6FJX 6G 6FJX90L 27 24 3 8 X 27 HYDRAULIC HOSE 1 29828 5 8 O RING X 3 8 TUBE 90 ADAPTOR 8 HYDRAULIC VALVE OUTLET TO HYDRAULIC RESERVOIR RETURN 1 8M3K 8G 8FJX9...

Страница 37: ...37 Patcher I Diesel NOTES...

Страница 38: ...201 38 14 Crafco Inc...

Отзывы: