Act1 Electrofusion Welder
06/06/2011
www.ProcessPipes.co.uk
Pg 24
Marking Pipe Ends
Use the following table to mark the pipe ends to the correct depth (mm). Do not use wax crayons
for marking.
Size
Depth
Size
Depth
Size
Depth
Size
Depth
20
35
63
59
140
92
250
130
25
39
75
64
160
93
315
148
32
40
90
72
180
105
40
45
110
80
200
105
50
51
125
85
225
106
Typical rotary peeling tool
available for hire from
CPV Ltd
Peeling Tool -
Scrape (using hand scraper) or peel (using a
rotary peeling tool) the pipe ends to the marked
insertion depth.
It is vitally important that the pipe
surface oxidised layer is removed otherwise good
welding will not be achieved
. Also enough pipe
material must be removed to allow the pipe to fit
into the electrofusion coupler without having to
use excessive force.
Step 3 – Electrofusion Couplers
Remove the electrofusion fitting from its PE bag.
Do not touch or contaminate the internal welding
surfaces. The fusion and cooling times are printed
on the electrofusion coupler label. Terminal pins
are normally 4mm in diameter, and this is stated
on the label. Older fittings may have 4.7mm pins,
if so the label will not state the size.
Содержание Act1
Страница 1: ...Act1 Electrofusion Welder ...
Страница 27: ......