CPG CBL15 Скачать руководство пользователя страница 7

 

OPERATION INSTRUCTIONS 

 

OPERATION

:  Turn  the  burners  on  about  15-20  minutes  before  cooking  for  prehea

ti

ng.  Set  the 

knobs  to  the  desired 

ame  height  or  temperature.  Each  valve  will  control  the  gas 

ow  to  the 

burner to bring that area of the unit up to the set temperature. If di

erent temperature se

tti

ngs 

are  to  be  used,  adjoining  areas  should  be  set  at  progressively  higher  temperatures  using  the 

lowest temperatures on the outside burners. A uniform and systema

ti

c approach to the loading of 

the unit will produce the most consistent product results.   

 

RADIANTS

Only use to CBR15,CBR24,CBR36,CBR48

Place the radiants in their posi

ti

on as shown in Sketch 1. Make sure that the radiants are se

tti

ng 

properly  into  the  slots  on  the  front  and  rear  supports.  Radiants  should  be  centered  over  the 

straight sec

ti

on of the burners. 

 

COOKING GRATES 

Place the top cooking grates with the grid bars sloping toward the front as shown in Sketch 2. 

 

NOTE: When cooking grates are placed sloping toward the front, the grooves on top will guide the 

excess fat drippings into the grease trough. 

 

 

 

 

 

 

Edges of radiant

to fit in slots

on supports

 

 

 

             

Radiant

 

 

 

 

 

 

 

Positioning

Burner                  

Slots

 

 

CLEANING & MAINTENANCE 

INITIAL CLEANING: 

Prior to opera

ti

ng your new broiler, thoroughly wash the exterior with a mild detergent or soap 

solu

ti

on. Do not use abrasive cleaners, since this might damage the cabinet 

nish. If the stainless 

steel surfaces become discolored, scrub by rubbing only in the direc

ti

on of the 

nished grain. 

 

When the broiler is 

rst heated, it will smoke un

ti

l oil used in manufacturing, preserva

ti

on and 

dust  from  storage  and  shipping  are  burned  o

.  An  hour  at  "max."  on  all  burners  is  usually 

su

cient. 

 

 

SKETCH 1 

SKETCH 2 

Содержание CBL15

Страница 1: ...as Safety information can be obtained from your local gas supplier CAUTION These models are designed built and sold for commercial use only If these models are positioned so the general public can use...

Страница 2: ...l experience years of reliable operation from this equipment To ensure best results it is important that you read and follow the instructions in this manual carefully TABLE OF CONTENTS ITEM PAGE ITEM...

Страница 3: ...ughly reads understands and follows these instructions If you have questions concerning the installation operation maintenance or service of this product visit Cooking Performance Group s website at w...

Страница 4: ...N NON COMBUSTIBLE SURFACES ONLY Combustible clearances 6 sides 152 mm 6 rear 152 mm 4 oor 102 mm Noncombustible clearances 0 sides 0 mm 0 rear 0 mm 4 oor 102 mm Do not obstruct the ow of combustion an...

Страница 5: ...panel 1 Remove the knobs and front panel 2 Uns 2 Unscrew bolts and pilot valve then remove the manifold 1 Remove the knobs and front panel Note Unit Number on side of orifice fittings Plastic Insert...

Страница 6: ...n the screws on the front of the burner and adjust the air shutter to just eliminate the yellow tips of the burner flame Lock the air shutter in place by tightening the screws CAUTION Never attempt to...

Страница 7: ...supports Radiants should be centered over the straight section of the burners COOKING GRATES Place the top cooking grates with the grid bars sloping toward the front as shown in Sketch 2 NOTE When co...

Страница 8: ...t are not to be adjusted by the installer unless the installer is an authorized service agent TOUBLESHOOTING GUIDE PROBLEM POSSIBLE CAUSE Heat does not come on when valve is on Pilot burner not lit Ga...

Страница 9: ...9 EXPLOSION VIEW DRAWING MODEL CBL24 CBR24...

Страница 10: ...R48 8 2 Cast Radiant CBR15 01 03 1015048 2 CBR24 4 CBR36 6 CBR48 8 3 Regulator 6 NAT or 10 LP 3 4 PT CBL15 CBR15 01 22 1069501 1 CBL24 CBR24 CBL36 CBR36 CBL48 CBR48 4 Stainless Steel Burner Assy U Sha...

Страница 11: ...t Pipe CBL15 CBR15 06 05 1472152 1 CBL24 CBR24 2 CBL36 CBR36 3 CBL48 CBR48 4 8 Pilot valve CBL15 CBR15 01 20 1068509 1 CBL24 CBR24 2 CBL36 CBR36 3 CBL48 CBR48 4 9 Valve For Manual CBL15 CBR15 01 20 10...

Страница 12: ...e 49 LPG CBL15 CBR15 01 20 1068649 1 CBL24 CBR24 2 CBL36 CBR36 3 CBL48 CBR48 4 12 Cast Iron Lava Rack CBL15 01 03 1015106 2 CBL24 4 CBL36 6 CBL48 8 13 Lava Rock CBL15 06 05 1472464 1 CBL24 2 CBL36 3 C...

Страница 13: ......

Страница 14: ......

Страница 15: ...V1 Rev1 12 14...

Страница 16: ...e occurs because of accident carelessness lack of proper set up supervision when required or if the equipment is installed or operated in any manner contrary to the installation and operating instruct...

Отзывы: