5
I
L
M
N
J
Q
Step 6: Place Chimney section (H) on top of Roof (F) and twist slowly until the slots align
with the tabs and lock into place. Be sure to turn clockwise until tight and secure.
Step 8: Place the Cap(J)onto the Chimney (I)
Step 9: Attach the Handle(P) to the Door(C)
Step 10: Attach Ash Pan(N) to underside of Fire Bowl(M),also attach the 2 Handles(Q)
to upside of the Fire Bowl(M).Place Log Rack(L) into Fire Bowl(M)
Step 7
P
Step 8
H
F
Step 6
Step 7: Place Chimney section (I) on top of Chimney section (H)
and twist slowly until the tabs align with the slots and lock
into place. Be sure to turn clockwise until tight and secure.