5. When all connections have been made, make sure all range controls are in the “off” position
and turn on main gas supply valve
Installation
and turn on main gas supply valve.
6. Use a leak detector at all joints and connections to check for leaks in the system. Do not use a
flame to check for gas leaks.
The appliance must be isolated from the building’s gas supply piping system by closing its
individual manual shut-off valve during any pressure testing of the gas supply piping system at
test pressure equal to or less than ½ psig (3.5kPa).
Wood/Composite Overlay Installation
Wood/Composite Overlay Installation
The bottom of the hood should be 30
′′
min. to 36
′′
above the counter top. This would typically
result in the bottom of the hood being 66
′′
to 72
′′
above the floor. These dimensions provide safe
and efficient operation of the hood.
After Installation:
Check ignition of cooktop burners.
Check the air shutter adjustment – sharp blue flame, with no yellow tipping or lifting flames.
Check ignition of oven burner.
Visually check tubular burner (oven burner) re-ignition to be sure both rows of burner ports are
Visually check tubular burner (oven burner) re-ignition to be sure both rows of burner ports are
relighting each time.
Check for gas leaks at all gas connections (using a gas detector, never a flame).
Check oven bake and convection bake function.
8