![Cosen SH-510LDMM Скачать руководство пользователя страница 52](http://html1.mh-extra.com/html/cosen/sh-510ldmm/sh-510ldmm_instruction-manual_2670370052.webp)
4-16
TEST-RUNNING THE MACHINE
Test-running this machine can ensure good machine performance in the future. We suggest you run
the following tests on the machine before first use:
Testing machine performance:
Turn on the power and run a basic performance test after you finish installing the machine. Follow
these steps to test machine performance:
Step 1 – Disassemble shipping brackets and bolts.
Step 2 – Install roller table (optional).
Step 3 – Turn on the relay switch in the control box.
Step 4 – Elevate the saw bow. (If your coolant pump is in reverse and the machine cannot run, please
change the electrical phase.)
Step 5 – After the saw bow ascends, extend the quick approach device(optional).
Step 6 – Remove the rust-prevention grease with cleaning oil or kerosene.
Step 7 – Start the coolant pump.
Step 8 – Test these functions under manual mode:
vise clamping/unclamping
saw bow ascending/descending
feeding forward and backward.
Содержание SH-510LDMM
Страница 2: ......
Страница 4: ......
Страница 10: ......
Страница 16: ...1 6 Illustration Emergency Stop Emergency Stop Button ...
Страница 18: ...1 8 Illustration Safety Labels ...
Страница 20: ......
Страница 24: ...2 4 FLOOR PLAN Machine top view ...
Страница 25: ...2 5 Machine front view ...
Страница 26: ...2 6 Machine side view ...
Страница 55: ...5 1 Section 5 ELECTRICAL SYSTEM ELECTRICAL CIRCUIT DIAGRAMS ...
Страница 56: ...5 2 ...
Страница 57: ...5 3 ...
Страница 58: ...5 4 ...
Страница 59: ...5 5 ...
Страница 60: ...5 6 ...
Страница 61: ...6 1 Section 6 HYDRAULIC SYSTEM HYDRAULIC DIAGRAMS ...
Страница 62: ...6 2 ...
Страница 84: ......
Страница 86: ......
Страница 87: ......