background image

2.1  Input voltage range  

 

RB-9

2.2  Inrush current limiting  

 

RB-9

2.3  Overcurrent protection  

 

RB-9

2.4  Overvoltage protection  

 

RB-9

2.5  Output voltage adjustment range  

 

RB-9

2.6  Output ripple and ripple noise  

 

RB-9

2.7 Isolation 

 

 

RB-9

2.8  Start/stop sequence  

 

RB-9

1 Configuration - Model Name Construction

RB-8

3 Series Operation and Parallel Operation

RB-10

3.1  Series Operation  

 

RB-10

3.2  Parallel Operation  

 

RB-10

4 Assembling and Installation Method

RB-10

5 Option and Others

RB-12

4.1  Heat dissipation (derating)  

 

RB-10

4.2  Installation method  

 

RB-11

4.3  Mounting screw  

 

RB-11

4.4 Ground 

 

 

RB-11

4.5  Expectancy life and warranty  

 

RB-11

5.1  Outline of options  

 

RB-12

5.2 Others 

 

 

RB-13

2 Function

RB-9

AC-DC Power Supplies Configurable Type

Instruction Manual

RB-7

Содержание RBC200F

Страница 1: ...Parallel operation Input module of RBC200F Active filter 40 220 2 4 1 Relay FR 4 Yes No No Output module of Y Z LLC resonant converter 90 180 FR 4 Yes No No Output module of G H J K L Flyback converte...

Страница 2: ...odel Name Construction RB 8 3 Series Operation and Parallel Operation RB 10 3 1 Series Operation RB 10 3 2 Parallel Operation RB 10 4 Assembling and Installation Method RB 10 5 Option and Others RB 12...

Страница 3: ...1 output is connected to V1 G1 Slot 2 output is connected to V2 V2 and G2 Slot 3 output is connected to V3 G3 Configuration rules 1 The code of the module installed in Slot 1 is selected from Slot 1 o...

Страница 4: ...tage protection circuit is built in If the overvoltage pro tection circuit is activated shut down the input voltage wait more than 3 minutes and turn on the AC input again to recover the out put volta...

Страница 5: ...ing on input voltage is shown in Fig 4 3 The definition of load factor is the following suffix k means the k th slot Ak Ik Vk Rated output power of k th module Rated output power Depends on input refe...

Страница 6: ...ing screw should be M3 The hatched area shows the allowance of metal parts for mounting 8 8 8 8 8 8 8 8 CN1 CN2 CN3 FG Fig 4 7 Allowance of metal for mounting If the power supply unit is fixed with me...

Страница 7: ...5 1 Table 5 4 and Table 5 5 Table 5 3 Maximum temperature of measurement points RBC200F O SN Installation condition Cooling Method Load factor Maximum temperature C 1 Capacitor 2 V1 Capacitor 3 V2 Ca...

Страница 8: ...y If you wire incorrectly the internal compo nents of a unit may be damaged T Option T units have vertically positioned screws on a terminal block The size specification is different from standard ver...

Отзывы: