User Manual v1.0
UM - Everon 6000 DAS - 14-APR-2021 - clear of comments.docx| March 2021
|Page 67 of 202
2.6.6.1 Power
Connect the DC wire pair (48V) to the LRU connectors panel, via the DC power adapter (terminal block
connector
2.6.6.2 SFP+ Cables
Remove the rubber stopper from the SFP+ connector located in the LRU RF port
Connect the SFP+ LC/UPC SM DX optic cable to the LRU optic connector.
Figure 10 Remove rubber stopper from port and from SFP+ Pluggable Transceiver and insert the SFP+ Pluggable
Transceivers (hot-pluggable optical transceiver module) into the port.
SFP+ Pluggable
Transceivers
SFP+ Cable
Содержание Everon 6000 v1.0
Страница 1: ...Everon 6000 v1 0 User Manual Corning Optical Communications www corning com...
Страница 2: ...User Manual v1 0 Everon 6000 v1 0 User Manual...
Страница 9: ...User Manual v1 0 UM Everon 6000 DAS 14 APR 2021 clear of comments docx March 2021 Page 9 of 202...
Страница 97: ...User Manual v1 0 UM Everon 6000 DAS 14 APR 2021 clear of comments docx March 2021 Page 97 of 202...