User Manual v1.0
UM - Everon 6000 DAS - 14-APR-2021 - clear of comments.docx| March 2021
|Page 12 of 202
Table of Contents
1.
Introduction .................................................................................................................... 15
1.1
Key Features and Capabilities ............................................................................................... 15
1.2
Terminology, Acronyms, and Abbreviations .......................................................................... 16
1.3
Applicable Documents ......................................................................................................... 19
1.4
Everon™ 6000 1.0 Architecture Overview ............................................................................. 20
1.4.1
External Interfaces and Use Cases - Example .................................................................. 20
1.4.2
Internal sub-units .......................................................................................................... 23
2.
System Installation .......................................................................................................... 26
2.1
Head End Units – Architecture Examples............................................................................... 27
2.2
Integrated Headend Unit (IHU) Installation ........................................................................... 29
2.2.1
Verify Box Contents ....................................................................................................... 30
2.2.2
IHU Interfaces and Slots ................................................................................................. 33
2.2.3
Mount the Chassis in a Rack ........................................................................................... 34
2.2.4
Install the Modules in the Chassis .................................................................................. 35
2.2.5
Connect the Cables ........................................................................................................ 36
2.2.6
Power ON...................................................................................................................... 40
2.2.7
Verify NORNAL Operation .............................................................................................. 41
2.3
Head End Unit (HEU) Installation .......................................................................................... 42
2.3.1
Verify Box Contents ....................................................................................................... 43
2.3.2
Mount the Chassis ......................................................................................................... 46
2.3.3
Install the Modules in the Chassis .................................................................................. 47
2.3.4
Connect the Cables ........................................................................................................ 48
2.3.5
Power ON...................................................................................................................... 50
2.3.6
Verify NORNAL Operation .............................................................................................. 51
2.4
Additional stack and DRU connections .................................................................................. 52
2.5
DRU Installation ................................................................................................................... 53
2.5.1
Verify box contents ....................................................................................................... 53
2.5.2
DRU Interfaces .............................................................................................................. 54
2.5.3
DRU Dimensions [mm] .................................................................................................. 55
2.5.5
Mount the DRU in the 19’’ Rack ..................................................................................... 56
2.5.6
Connect the Cables ........................................................................................................ 56
2.5.7
Verify Normal Operation ............................................................................................... 58
2.6
LRU Installation.................................................................................................................... 60
2.6.1
Verify box Contents ....................................................................................................... 60
Содержание Everon 6000 v1.0
Страница 1: ...Everon 6000 v1 0 User Manual Corning Optical Communications www corning com...
Страница 2: ...User Manual v1 0 Everon 6000 v1 0 User Manual...
Страница 9: ...User Manual v1 0 UM Everon 6000 DAS 14 APR 2021 clear of comments docx March 2021 Page 9 of 202...
Страница 97: ...User Manual v1 0 UM Everon 6000 DAS 14 APR 2021 clear of comments docx March 2021 Page 97 of 202...