background image

shower holder

top rail bracket

slider rail

selector valve

1.

2.

STEP 1

Insert the Top Rail Bracket, Adjustable 

Shower Holder, & Bottom Rail Bracket     

 to the Slider Rail. 

STEP 2

Connect the Selector Valve to the 

bottom of Slider Rail. 

bottom rail bracket

38mm

38mm

1300mm

650mm

wall plug hole

screw

mounting terminal

3.

4.

Select a suitable position for the Rain 

Shower Set then mark 4 screws point

(2 on top and 2 on bottom). The gap of

2 screw hole was 38mm.  It is 

recommended that the Top Rail Bracket 

position at height of 1950mm to the floor

and Bottom Rail Bracket 1300mm to the 

floor.        

 

wall plug

STEP 4

Use 6mm diameter drill and 

make the wall  plug holes in 

 depth of 34mm. Insert the wall  

plugs and mounting terminal  

firmly in position with the 

screw provided.

  

STEP 5

Mount the Slider Rail (connected 

with Rail Bracket, Adjustable 

Shower Holder and Selector Valve)  

  to the mounting terminal

 by turns the terminal cover.  

5.

STEP 3

1200mm

650mm

100mm

PVC hose

rain 

shower

head

shower 

head

7.

8.

STEP 7

Connect the Rain Shower Head to the top of 

Slider Rail, 1.5Meter PVC Hose to Hand Shower 

Head and 1Meter PVC Hose to the Heater. 

Connected be sure to put in the Rubber Washer.    

STEP 8

Recommended Height for Rain 

Shower Set.

rubber

washer

a

b

c

d

rail bracket cap

hexagon tool

plastic nut

6.

STEP 6

Remove the cover and cap from 

the Rail Bracket (Fig. 3A) and 

screw the rail bracket by turning 

the cover clockwise. Using hexagon 

tool to tighten the plastic nut to the 

desire position and then replace 

the cover.   

 

rail bracket
cover

rain 

shower

head

continue from RAIN SHOWER SET INSTALLATION PROCEDURES

continue from RAIN SHOWER SET INSTALLATION PROCEDURES

Содержание CIS-E363DCR

Страница 1: ...Instant Water Heater CIS E363DCR CIS E369DCR User Manual ...

Страница 2: ...ORMATION For Pump Model it is highly recommended to connect the Water Inlet Connection to tank storage supply otherwise it may cause damage to the Pump Motor maximum 2 working pressure of 6 bars 2 G G Fig 1 32 32 19 20 21 22 23 24 25 26 27 28 29 19 20 21 22 23 24 25 27 28 29 30 31 8 9 10 8 9 10 2 Face Sticker 1 Front Cover 3 Indicator Lamp 5 Temperature Control Knob 4 Pump Knob 6 Test Reset Button...

Страница 3: ... HEATER UNIT HEATER UNIT INSTALLATION DIAGRAM RAIL BRACKET COVER CAP DISMANTLE STEPS RAIL BRACKET OPEN THE RAIL BRACKET COVER BY TURNING ANTI CLOCKWISE USING SCREW DRIVER TO OPEN THE CAP RAIL BRACKET COVER COME OUT 1 2 3 RAIN SHOWER SET INSTALLATION PROCEDURES G 65mm 255mm ...

Страница 4: ... in position with the screw provided STEP 5 Mount the Slider Rail connected with Rail Bracket Adjustable Shower Holder and Selector Valve to the mounting terminal by turns the terminal cover 5 STEP 3 1200mm 650mm 100mm PVC hose rain shower head shower head 7 8 STEP 7 Connect the Rain Shower Head to the top of Slider Rail 1 5Meter PVC Hose to Hand Shower Head and 1Meter PVC Hose to the Heater Conne...

Страница 5: ...LLATION IMPORTANT Make sure to put the Mesh Filter between Stop Valve and incoming water piping 3 If in any case the Stop Valve is not use or omitted make sure to put the Mesh Filter between the heater unit inlet pipe and incoming water pipe PLUMBING PROCEDURE IMPORTANT correct over tighten and damage 7 8 To ensure the power cord NOT touch copper flange G Side Entry A B ...

Страница 6: ...0 Release Knob G Position this Way Position this Way 7 turn knob Press the RESET button the 3 LED indicator lights shall run ON OFF 3 times in sequences to indicate self check as in No 2 above and the Heater Unit should resume normal function the Green LED Indicator should light on Switch on the electrical supply The 3 LED indicator light shall run ON OFF 3 times in sequences to indicate the set a...

Страница 7: ...soft brush from time to time Recommended once a week Note Take care not to damage the holes of the Handshower Head during cleaning 8 WIRING DIAGRAM LIVE NEUTRAL Main Supply 220 240 V a c TRIAC Lout Nout Nin Lin Electronic ELCB 15mA Sensitivity Heater Control Reset Test Pump Booster T2 G Auto Thermostat Manual Thermostat Pump On Off Power On Off Temperature Control On Off Switch Led Board SMPS PCB ...

Страница 8: ... G Pump On Off Power On Off Temperature Control On Off Switch Led Board SMPS PCB ASSY Silent Pump Auto Thermostat WIRING DIAGRAM SINGLE POLE MODEL SILENT PUMP MODEL ELECTRICAL SPECIFICATION EP 6 0 Kg ELCB A C PUMP ESP 5 3 Kg ELCB SILENT PUMP 250 X 400 X 105 mm 3 3kW 230Va c 2 0 1 Bar 10kPa Min INLET WATER PRESSURE Max INLET WATER PRESSURE 6 0 Bar 0 6MPa continue from WIRING DIAGRAM WIRING DIAGRAM ...

Отзывы: